My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-019
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 11:45:13 AM
Creation date
4/25/2016 1:24:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/10/2015
Control Number
2015-019
Agenda Item Number
8.G.
Entity Name
Andersen Andre Consulting Engineer, Inc
Subject
Work Order No.1
South County Regional Park
Testing
Area
South County Regional Park
Alternate Name
AED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intergenerational Recreation Center Page -6- <br />AACE Proposal No. P14-392 <br />The following conditions apply to this project: <br />(1) A minimum of 4 density tests or 1 set of concrete testing will need to be performed per hour, per visit to the site. <br />(2) Stand-by time will be charged at $55.00/hour per technician. <br />(3) We note that density testing frequencies are approximate and based on our experience with similar projects and <br />anticipated contractor methodologies. Allowances for re -tests (from failing density tests) are not included herein. <br />(4) The contractor should contact Andersen Andre Consulting Engineers, Inc. at (772) 807-9191 a minimum of 24 <br />hours prior to any testing and 48 hours pnor to weekend and evening work. <br />Unit rates apply to standard working days, Monday through Friday, 7:00 a.m to 6:00 p.m. Testing and hourly rates <br />will be increased by 50% for weekend, holiday or after-hours services. <br />(5) <br />(6) The following testing costs are not included within this estimate: costs associated with asphalt testing (either in the <br />field or laboratory) or bacteriological testing of potable water (bac-t's). Such testing can be performed if requested <br />using the rates included herein. <br />(7) <br />If our testing estimate for a specific work element is insufficient for that particular activity, resources from another <br />work element can be used without prior authorization from the client as long as our total cost esumate is not <br />exceeded. We will notify you in advance if it appears that the cost estimate presented in the attached unit fee <br />schedule will be exceeded. <br />(8) Soil sample pickup for laboratory testing (e.g., Proctor testing) will be billed at $55.00/hour if not scheduled with <br />other work. <br />(9) <br />We note that the number of sets of concrete cylinders is dependent on numerous factors, such as the size and <br />duration of pours. For example, if numerous "smaller" pours (e.g., 10 -yard pours) occur during construction, our <br />estimate for the number of sets of concrete cylinders may be exceeded, thus requiring revision of this proposal to <br />account for this testing cost increase. <br />(10) No paint -thickness or fire proofing thickness testing, bolt -tightness, steel or weld inspections, or floor levelness <br />testing are included herein; we would be pleased to revise this proposal to include such services if requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.