Laserfiche WebLink
170' of pipe was used to extend drainage into the maintenance <br />area to provide better drainage. <br />295' of pipe was saved on hole #8- <br />840' Total. <br />Tommy, I hope this is an adequate breakdown of where this additional <br />pipe is to be used. Should you have any questions or comments, please <br />calla <br />Sincerely, <br />LINKS DESIGN, INC. <br />G. <br />BRUCE C. SHELDON <br />ASSOCIATE <br />704 S. Missouri Ave. <br />L- AUG <br />LINKS DESIGN INC. <br />Lakeland, Florida 33801 <br />(813) 688-8383 <br />Acting Administrator Thomas explained that the larger pipe <br />is needed in the event the ponds are used for holding effluent in <br />the future. <br />Chairman Scurlock suggested that Utilities Director Pinto be <br />consulted before the pipe is put in to be sure they are going to <br />take the effluent to those holding ponds. <br />Mr. Thomas recommended these lakes be connected for holding <br />purposes in any event because if we had to go in and do this <br />after the golf course is completed, it then would involve much <br />more labor, inconvenience and money. He further pointed out that <br />some money was saved on hole #8 and this is all well within the <br />funds which were allocated for irrigation purposes. <br />Commissioner Lyons concurred that we don't want to chance <br />having to tear up the golf course after it is completed, and he <br />felt this is a cheap bit of insurance. <br />ON MOTION by Commissioner Bird, SECONDED by Com- <br />missioner Lyons, the Board unanimously approved <br />Change Order No. 4 (Guettler & Sons) for aluminum <br />pipe in the amount of $6098.40. <br />35 Bom 65 nGr 0 <br />