My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/6/1986
CBCC
>
Meetings
>
1980's
>
1986
>
8/6/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:03 AM
Creation date
6/12/2015 12:48:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/06/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of perspective. <br />Boa5lu,E.105 <br />He noted that he had the same problem with <br />petition paving, but resolved it by simply assessing the people <br />$1.00 a foot for equipment, and he would like the Board's okay to <br />handle the equipment charges for this work in a similar manner. <br />Chairman Scurlock stated that if that is what Director Davis <br />felt was equitable, he had no problem with it, and it was <br />indicated that the Board just wished this to be charged out at <br />some reasonable rate. <br />Chairman Scurlock further pointed out that Public Works <br />Director Davis has had to pull crews off some of his normal <br />projects to do these other things, and we must keep track because <br />possibly in some cases it would be cheaper to go out and <br />contract. <br />GOLF COURSE CHANGE ORDER - ALUMINUM PIPE (GUETTLER) <br />Acting Administrator Thomas read the following letter <br />received from Golf Course Architect Ron Gar[: <br />August 5, 1986 <br />Mr. Tommy Thomas <br />INDIAN RIVER COUNTY <br />1840 25th Street <br />Vero Beach, FL 32960 <br />RE: Sandridge Golf Course <br />Dear Tommy: <br />A change order for the purchase of 840' of 18" aluminum pipe has been <br />issued and I would like to explain where this pipe is being used: <br />565'. of pipe was added in a total of 8 locations connecting <br />to the 2 drainage canals to satisfy Indian River Farms Water <br />Control District (Marvin Carter, representative). <br />400' of pipe is to be used to connect 2 lakes for irrigation <br />purposes. (2 lakes to be future effluent holding ponds.) <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.