My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 11:53:30 AM
Creation date
4/26/2016 12:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 1
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
275-036-11 <br />EQUAL OPPORTUNITY OFFICE <br />03711 <br />Page 7 d 8 <br />4 Provide adequate information about the plans, specifications, and requirements of the contract, not <br />rejecting subcontractors without sound reasons based on a thorough investigation of their capabilities; <br />5. Waive requirements of performance bonds where it is practical to do so, <br />6. Attend pre-bid meetings held by the Florida Department of Transportation to apprise disadvantaged <br />subcontractors of opportunities with the Company; <br />7. Follow up on initial solicitations of interest to DBE subcontractors to determine wittircertainty whether the <br />DBE company is interested in the subcontract opportunity. <br />/Iunderstands that this list of affirmative <br />action methods is not exha istive and will include additioru approaches after having established familiarity with the <br />disadvantaged subcontracting community and/or determined the stated approaches to be ineffective. <br />111. IMPLEMENTATION -� <br />On contracts with specific DBE goals, 1 1 i <br />�t11�� (fJn-�tc <br />will make every effort to meet contract goals as stated by utilizing its affirmative action meth b . On projects with no <br />specific goals, the Company will, as an expression of good faith, seek to utilize DBE subcontractors where work is to be <br />subcontracted. <br />IV. REPORTING <br />1 <br />are necessary to d <br />I 'L <br />✓U -` shall keep and maintain such records as <br />mine the Company's complitdce with its DBE Affirmative Action Plan. <br />The Company will design its record keeping system to indicate: <br />1. The number of DBE subcontractors and suppliers used by the Company, identifying the items of work, <br />materials and services provided; <br />2. The efforts and progress being made in obtaining DBE subcontractors through local and community sources; <br />3. Documentation of all contracts, to include correspondence, telephone calls, newspaper advertisements, etc., <br />to obtain DBE participation on all Florida Department of Transportation projects; <br />4. The Company shall comply with Florida Department of Transportation's requirements regarding <br />payments to subcontractors including DBEs for each month (estimate period) in which the <br />companies have worked. <br />V. DDE DIRECTORY <br />1 An <br />by the Florida Depart of Transportation. <br />will utilize the DBE Directory published <br />The Company will distribute Form Number 275-030-01, Schedule A Certification Form Number 1, to potential <br />DBE contractors and assist in their completion. <br />470-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.