My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
View images
View plain text
3 differs materially from that shown or or becoming bound under a negotiated <br /> indicated in the Contract Documents, or contract; or <br /> 4 is of an unusual nature, and differs b the existence of such condition could <br /> materially from conditions ordinarily reasonably have been discovered or <br /> encountered and generally recognized as inher- revealed as a result of any examination, <br /> ent in work of the character provided for in the investigation, exploration, test, or study of <br /> Contract Documents, the Site and contiguous areas required by <br /> the Bidding Requirements or Contract <br /> then CONTRACTOR shall, promptly after becoming Documents to be conducted by or for CON- <br /> aware thereof and before further disturbing the TRACTOR prior to CONTRACTOR's <br /> subsurface or physical conditions or performing any making such final commitment; or <br /> Work in connection therewith (except in an emergency <br /> as required by paragraph 6 16.A), notify OWNER and c. CONTRACTOR failed to give the <br /> ENGINEER in writing about such condition written notice within the time and as re- <br /> CONTRACTOR shall not further disturb such quired by paragraph 4.03.A. <br /> condition or perform any Work in connection therewith <br /> (except as aforesaid) until receipt of written order to do 3 If OWNER and CONTRACTOR are <br /> so. unable to agree on entitlement to or on the <br /> amount or extent, if any, of any adjustment in <br /> B. ENGINEER's Review. After receipt of written the Contract Price or Contract Times, or both, a <br /> notice as required by paragraph 4 03.A, ENGINEER Claim may be made therefor as provided in <br /> will promptly review the pertinent condition, determine paragraph 10.05 However, OWNER, <br /> the necessity of OWNER's obtaining additional ENGINEER, and ENGINEER's Consultants <br /> exploration or tests with respect thereto, and advise shall not be liable to CONTRACTOR for any <br /> OWNER in writing (with a copy to CONTRACTOR) of claims, costs, losses, or damages (including <br /> ENGINEER's findings and conclusions. but not limited to all fees and charges of <br /> engineers, architects, attorneys, and other <br /> C. Possible Price and Times Adjustments professionals and all court or arbitration or other <br /> dispute resolution costs) sustained by <br /> 1 The Contract Price or the Contract CONTRACTOR on or in connection with any <br /> Times, or both, will be equitably adjusted to the other project or anticipated project. <br /> extent that the existence of such differing <br /> subsurface or physical condition causes an in- 4.04 Underground Facilities <br /> crease or decrease in CONTRACTOR's cost <br /> of, or time required for, performance of the A. Shown or Indicated.The information and data <br /> Work; subject, however, to the following: shown or indicated in the Contract Documents with <br /> respect to existing Underground Facilities at or <br /> a. such condition must meet any one or contiguous to the Site is based on information and <br /> more of the categories described in para- data furnished to OWNER or ENGINEER by the <br /> graph 4.03.A; and owners of such Underground Facilities, including <br /> OWNER, or by others. Unless it is otherwise <br /> b. with respect to Work that is paid for expressly provided in the Supplementary Conditions: <br /> on a Unit Price Basis, any adjustment in <br /> Contract Price will be subject to the 1 OWNER and ENGINEER shall not <br /> provisions of paragraphs 9 08 and 11.03 be responsible for the accuracy or com- <br /> pleteness of any such information or data, and <br /> 2. CONTRACTOR shall not be entitled <br /> to any adjustment in the Contract Price or 2. the cost of all of the following will be <br /> Contract Times if- included in the Contract Price, and CONTRAC- <br /> TOR shall have full responsibility for <br /> a. CONTRACTOR knew of the <br /> existence of such conditions at the time a. reviewing and checking all such <br /> CONTRACTOR made a final commitment information and data, <br /> to OWNER in respect of Contract Price and <br /> Contract Times by the submission of a Bid <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700- 12 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)Vadmim\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).