My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. locating all Underground Facilities 4.05 Reference Points <br /> shown or indicated in the Contract <br /> Documents, A. OWNER shall provide engineering surveys to <br /> establish reference points for construction which in <br /> c. coordination of the Work with the ENGINEER's judgment are necessary to enable <br /> owners of such Underground Facilities, CONTRACTOR to proceed with the Work. CON- <br /> including OWNER, during construction, and TRACTOR shall be responsible for laying out the <br /> Work, shall protect and preserve the established <br /> d the safety and protection of all such reference points and property monuments, and shall <br /> Underground Facilities and repairing any make no changes or relocations without the prior <br /> damage thereto resulting from the Work. written approval of OWNER. CONTRACTOR shall <br /> report to ENGINEER whenever any reference point or <br /> B Not Shown or Indicated property monument is lost or destroyed or requires <br /> relocation because of necessary changes in grades or <br /> 1 If an Underground Facility is locations, and shall be responsible for the accurate <br /> uncovered or revealed at or contiguous to the replacement or relocation of such reference points or <br /> Site which was not shown or indicated, or not property monuments by professionally qualified <br /> shown or indicated with reasonable accuracy in personnel. <br /> the Contract Documents, CONTRACTOR shall, <br /> promptly after becoming aware thereof and 406 Hazardous Environmental Condition at Site <br /> before further disturbing conditions affected <br /> thereby or performing any Work in connection A. Reports and Drawings: Reference is made to <br /> therewith (except in an emergency as required the Supplementary Conditions for the identification of <br /> by paragraph 6.16.A), identify the owner of those reports and drawings relating to a Hazardous <br /> such Underground Facility and give written Environmental Condition identified at the Site, if any, <br /> notice to that owner and to OWNER and ENGI- that have been utilized by the ENGINEER in the <br /> NEER. ENGINEER will promptly review the preparation of the Contract Documents. <br /> Underground Facility and determine the extent, <br /> if any, to which a change is required in the B Limited Reliance by CONTRACTOR on <br /> Contract Documents to reflect and document Technical Data Authorized: CONTRACTOR may rely <br /> the consequences of the existence or location upon the general accuracy of the "technical data" <br /> of the Underground Facility During such time, contained in such reports and drawings, but such <br /> CONTRACTOR shall be responsible for the reports and drawings are not Contract Documents. <br /> safety and protection of such Underground Such "technical data" is identified in the <br /> Facility Supplementary Conditions. Except for such reliance <br /> on such "technical data," CONTRACTOR may not rely <br /> 2. If ENGINEER concludes that a upon or make any Claim against OWNER, <br /> change in the Contract Documents is required, ENGINEER or any of ENGINEER's Consultants with <br /> a Work Change Directive or a Change Order respect to* <br /> will be issued to reflect and document such <br /> consequences. An equitable adjustment shall 1. the completeness of such reports <br /> be made in the Contract Price or Contract and drawings for CONTRACTOR's purposes, <br /> Times, or both, to the extent that they are including, but not limited to, any aspects of the <br /> attributable to the existence or location of any means, methods, techniques, sequences and <br /> Underground Facility that was not shown or procedures of construction to be employed by <br /> indicated or not shown or indicated with CONTRACTOR and safety precautions and <br /> reasonable accuracy in the Contract programs incident thereto; or <br /> Documents and that CONTRACTOR did not <br /> know of and could not reasonably have been 2. other data, interpretations, opinions <br /> expected to be aware of or to have anticipated. and information contained in such reports or <br /> If OWNER and CONTRACTOR are unable to shown or indicated in such drawings; or <br /> agree on entitlement to or on the amount or <br /> extent, if any, of any such adjustment in 3 any CONTRACTOR interpretation of <br /> Contract Price or Contract Times, OWNER or or conclusion drawn from any "technical data" <br /> CONTRACTOR may make a Claim therefor as or any such other data, interpretations, opinions <br /> provided in paragraph 10 05. or information. <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700- 13 <br /> F:1Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)tHdmim\bid documentsWaster Contract Documentst00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.