means, method, technique, sequence, or procedure of satisfactory evidence (including reports of required
<br /> construction which is shown or indicated in and tests) as to the source, kind, and quality of materials
<br /> expressly required by the Contract Documents CON- and equipment. All materials and equipment shall be
<br /> TRACTOR shall be responsible to see that the stored, applied, installed, connected, erected,
<br /> completed Work complies accurately with the Contract protected, used, cleaned, and conditioned in
<br /> Documents. accordance with instructions of the applicable
<br /> Supplier, except as otherwise may be provided in the
<br /> B At all times during the progress of the Work, Contract Documents.
<br /> CONTRACTOR shall assign a competent resident
<br /> superintendent thereto who shall not be replaced 6.04 Progress Schedule
<br /> without written notice to OWNER and ENGINEER
<br /> except under extraordinary circumstances. The A. CONTRACTOR shall adhere to the progress
<br /> superintendent will be CONTRACTOR's schedule established in accordance with paragraph
<br /> representative at the Site and shall have authority to 2.07 as it may be adjusted from time to time as
<br /> act on behalf of CONTRACTOR. All communications provided below.
<br /> given to or received from the superintendent shall be
<br /> binding on CONTRACTOR. 1. CONTRACTOR shall submit to
<br /> ENGINEER for acceptance (to the extent indi-
<br /> 6 02 Labor, Working Hours cated in paragraph 2.07) proposed adjustments
<br /> in the progress schedule that will not result in
<br /> A. CONTRACTOR shall provide competent, changing the Contract Times (or Milestones).
<br /> suitably qualified personnel to survey, lay out, and Such adjustments will conform generally to the
<br /> construct the Work as required by the Contract Docu- progress schedule then in effect and additional-
<br /> ments. CONTRACTOR shall at all times maintain ly will comply with any provisions of the General
<br /> good discipline and order at the Site. Requirements applicable thereto
<br /> B Except as otherwise required for the safety or 2. Proposed adjustments in the
<br /> protection of persons or the Work or property at the progress schedule that will change the Contract
<br /> Site or adjacent thereto, and except as otherwise Times (or Milestones) shall be submitted in
<br /> stated in the Contract Documents, all Work at the Site accordance with the requirements of Article 12.
<br /> shall be performed during regular working hours, and Such adjustments may only be made by a
<br /> CONTRACTOR will not permit overtime work or the Change Order or Written Amendment in accor-
<br /> performance of Work on Saturday, Sunday, or any dance with Article 12.
<br /> legal holiday without OWNER's written consent(which
<br /> will not be unreasonably withheld) given after prior 6.05 Substitutes and "Or-Equals"
<br /> written notice to ENGINEER.
<br /> A. Whenever an item of material or equipment is
<br /> specified or described in the Contract Documents by
<br /> 603 Services, Materials, and Equipment using the name of a proprietary item or the name of a
<br /> particular Supplier, the specification or description is
<br /> A. Unless otherwise specified in the General Re- intended to establish the type, function, appearance,
<br /> quirements, CONTRACTOR shall provide and and quality required. Unless the specification or
<br /> assume full responsibility for all services, materials, description contains or is followed by words reading
<br /> equipment, labor, transportation, construction that no like, equivalent, or "or-equal" item or no
<br /> equipment and machinery, tools, appliances, fuel, substitution is permitted, other items of material or
<br /> power, light, heat, telephone, water, sanitary facilities, equipment or material or equipment of other Suppliers
<br /> temporary facilities, and all other facilities and may be submitted to ENGINEER for review under the
<br /> incidentals necessary for the performance, testing, circumstances described below
<br /> start-up, and completion of the Work.
<br /> 1 "Or-Equal" Items. If in ENGINEER's
<br /> B. All materials and equipment incorporated into sole discretion an item of material or equipment
<br /> the Work shall be as specified or, if not specified, shall proposed by CONTRACTOR is functionally
<br /> be of good quality and new, except as otherwise equal to that named and sufficiently similar so
<br /> provided in the Contract Documents. All warranties that no change in related Work will be required,
<br /> and guarantees specifically called for by the Specifica- it may be considered by ENGINEER as an
<br /> tions shall expressly run to the benefit of OWNER. If "or-equal" item, in which case review and
<br /> required by ENGINEER, CONTRACTOR shall furnish approval of the proposed item may, in
<br /> 00700-General Conditions REV 5-10-13.doc
<br /> 00700- 19
<br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documentsWlaster Contract Documents\00700-General Conditions
<br /> REV 510-13.doc
<br />
|