Laserfiche WebLink
ENGINEER's sole discretion, be accomplished perform adequately the functions and <br /> without compliance with some or all of the achieve the results called for by the general <br /> requirements for approval of proposed substi- design, be similar in substance to that <br /> tute items For the purposes of this paragraph specified, and be suited to the same use as <br /> 6 05.A.1, a proposed item of material or that specified. The application will state the <br /> equipment will be considered functionally equal extent, if any, to which the use of the pro- <br /> to an item so named if- posed substitute item will prejudice <br /> CONTRACTOR's achievement of Substan- <br /> a. in the exercise of reasonable tial Completion on time, whether or not use <br /> judgment ENGINEER determines that: (i) it of the proposed substitute item in the Work <br /> is at least equal in quality, durability, will require a change in any of the Contract <br /> appearance, strength, and design Documents (or in the provisions of any other <br /> characteristics, (ii) it will reliably perform at direct contract with OWNER for work on the <br /> least equally well the function imposed by Project) to adapt the design to the proposed <br /> the design concept of the completed Project substitute item and whether or not <br /> as a functioning whole, and; incorporation or use of the proposed substi- <br /> tute item in connection with the Work is sub- <br /> b. CONTRACTOR certifies that: (i) ject to payment of any license fee or royalty. <br /> there is no increase in cost to the OWNER, All variations of the proposed substitute <br /> and (ii) it will conform substantially, even item from that specified will be identified in <br /> with deviations, to the detailed requirements the application, and available engineering, <br /> of the item named in the Contract sales, maintenance, repair, and <br /> Documents. replacement services will be indicated The <br /> application will also contain an itemized esti- <br /> 2. Substitute Items mate of all costs or credits that will result <br /> directly or indirectly from use of such <br /> a. If in ENGINEER's sole discretion an substitute item, including costs of redesign <br /> item of material or equipment proposed by and claims of other contractors affected by <br /> CONTRACTOR does not qualify as an any resulting change, all of which will be <br /> "or-equal" item under paragraph 6 05.A.1, it considered by ENGINEER in evaluating the <br /> will be considered a proposed substitute proposed substitute item ENGINEER may <br /> item. require CONTRACTOR to furnish additional <br /> data about the proposed substitute item <br /> b. CONTRACTOR shall submit suffi- <br /> cient information as provided below to allow B Substitute Construction Methods or Proce- <br /> ENGINEER to determine that the item of dures: If a specific means, method, technique, se- <br /> material or equipment proposed is quence, or procedure of construction is shown or <br /> essentially equivalent to that named and an indicated in and expressly required by the Contract <br /> acceptable substitute therefor Requests for Documents, CONTRACTOR may furnish or utilize a <br /> review of proposed substitute items of substitute means, method, technique, sequence, or <br /> material or equipment will not be accepted procedure of construction approved by ENGINEER. <br /> by ENGINEER from anyone other than CONTRACTOR shall submit sufficient information to <br /> CONTRACTOR. allow ENGINEER, in ENGINEER's sole discretion, to <br /> determine that the substitute proposed is equivalent to <br /> c. The procedure for review by ENGI- that expressly called for by the Contract Documents <br /> NEER will be as set forth in paragraph The procedure for review by ENGINEER will be similar <br /> 6.05.A.2.d, as supplemented in the General to that provided in subparagraph 6 05.A.2. <br /> Requirements and as ENGINEER may <br /> decide is appropriate under the C. Engineer's Evaluation. ENGINEER will be <br /> circumstances. allowed a reasonable time within which to evaluate <br /> each proposal or submittal made pursuant to para- <br /> d CONTRACTOR shall first make graphs 6 05.A and 6 05 B ENGINEER will be the <br /> written application to ENGINEER for review sole judge of acceptability No "or-equal" or substitute <br /> of a proposed substitute item of material or will be ordered, installed or utilized until ENGINEER's <br /> equipment that CONTRACTOR seeks to review is complete, which will be evidenced by either a <br /> furnish or use. The application shall certify Change Order for a substitute or an approved Shop <br /> that the proposed substitute item will Drawing for an "or equal." ENGINEER will advise <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-20 <br /> F-1Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)Vidmimibid documentsWaster Contract Documents100700-General Conditions <br /> REV 5-10-13.doc <br />