Laserfiche WebLink
materials and equipment, and the operations of in any manner that will endanger the structure, nor <br /> workers to the Site and other areas permitted shall CONTRACTOR subject any part of the Work or <br /> by Laws and Regulations, and shall not adjacent property to stresses or pressures that will <br /> unreasonably encumber the Site and other endanger it. <br /> areas with construction equipment or other <br /> materials or equipment. CONTRACTOR shall 612 Record Documents <br /> assume full responsibility for any damage to <br /> any such land or area, or to the owner or A. CONTRACTOR shall maintain in a safe place <br /> occupant thereof, or of any adjacent land or at the Site one record copy of all Drawings, Specifica- <br /> areas resulting from the performance of the tions, Addenda, Written Amendments, Change <br /> Work. Orders, Work Change Directives, Field Orders, and <br /> written interpretations and clarifications in good order <br /> 2. Should any claim be made by any and annotated to show changes made during <br /> such owner or occupant because of the construction. These record documents together with <br /> performance of the Work, CONTRACTOR shall all approved Samples and a counterpart of all <br /> promptly settle with such other party by approved Shop Drawings will be available to ENGI- <br /> negotiation or otherwise resolve the claim by NEER for reference. Upon completion of the Work, <br /> arbitration or other dispute resolution these record documents, Samples, and Shop <br /> proceeding or at law. Drawings will be delivered to ENGINEER for OWNER. <br /> 3 To the fullest extent permitted by 613 Safety and Protection <br /> Laws and Regulations, CONTRACTOR shall <br /> indemnify and hold harmless OWNER, A. CONTRACTOR shall be solely responsible <br /> ENGINEER, ENGINEER's Consultant, and the for initiating, maintaining and supervising all safety <br /> officers, directors, partners, employees, agents, precautions and programs in connection with the <br /> and other consultants of each and any of them Work. CONTRACTOR shall take all necessary <br /> from and against all claims, costs, losses, and precautions for the safety of, and shall provide the <br /> damages (including but not limited to all fees necessary protection to prevent damage, injury or loss <br /> and charges of engineers, architects, attorneys, to: <br /> and other professionals and all court or <br /> arbitration or other dispute resolution costs) 1. all persons on the Site or who may <br /> arising out of or relating to any claim or action, be affected by the Work; <br /> legal or equitable, brought by any such owner <br /> or occupant against OWNER, ENGINEER, or 2. all the Work and materials and equip- <br /> any other party indemnified hereunder to the ment to be incorporated therein, whether in <br /> extent caused by or based upon storage on or off the Site, and <br /> CONTRACTOR's performance of the Work. <br /> 3 other property at the Site or adjacent <br /> B Removal of Debris During Performance of the thereto, including trees, shrubs, lawns, walks, <br /> Work: During the progress of the Work CONTRAC- pavements, roadways, structures, utilities, and <br /> TOR shall keep the Site and other areas free from Underground Facilities not designated for <br /> accumulations of waste materials, rubbish, and other removal, relocation, or replacement in the <br /> debris. Removal and disposal of such waste materi- course of construction. <br /> als, rubbish, and other debris shall conform to applica- <br /> ble Laws and Regulations. B CONTRACTOR shall comply with all applica- <br /> ble Laws and Regulations relating to the safety of <br /> C. Cleaning: Prior to Substantial Completion of persons or property, or to the protection of persons or <br /> the Work CONTRACTOR shall clean the Site and property from damage, injury, or loss; and shall erect <br /> make it ready for utilization by OWNER. At the com- and maintain all necessary safeguards for such safety <br /> pletion of the Work CONTRACTOR shall remove from and protection. CONTRACTOR shall notify owners of <br /> the Site all tools, appliances, construction equipment adjacent property and of Underground Facilities and <br /> and machinery, and surplus materials and shall other utility owners when prosecution of the Work may <br /> restore to original condition all property not designated affect them, and shall cooperate with them in the <br /> for alteration by the Contract Documents. protection, removal, relocation, and replacement of <br /> their property. All damage, injury, or loss to any <br /> D Loading Structures: CONTRACTOR shall not property referred to in paragraph 6 13.A.2 or 6 13.A.3 <br /> load nor permit any part of any structure to be loaded caused, directly or indirectly, in whole or in part, by <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-23 <br /> F\Public Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)V%dmim\bid documentsWlaster Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />