My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR, any Subcontractor, Supplier, or any <br /> other individual or entity directly or indirectly employed 617 Shop Drawings and Samples <br /> by any of them to perform any of the Work, or anyone <br /> for whose acts any of them may be liable, shall be A. CONTRACTOR shall submit Shop Drawings <br /> remedied by CONTRACTOR (except damage or loss to ENGINEER for review and approval in accordance <br /> attributable to the fault of Drawings or Specifications with the acceptable schedule of Shop Drawings and <br /> or to the acts or omissions of OWNER or ENGINEER Sample submittals. All submittals will be identified as <br /> or ENGINEER's Consultant, or anyone employed by ENGINEER may require and in the number of copies <br /> any of them, or anyone for whose acts any of them specified in the General Requirements. The data <br /> may be liable, and not attributable, directly or shown on the Shop Drawings will be complete with <br /> indirectly, in whole or in part, to the fault or negligence respect to quantities, dimensions, specified perfor- <br /> of CONTRACTOR or any Subcontractor, Supplier, or mance and design criteria, materials, and similar data <br /> other individual or entity directly or indirectly employed to show ENGINEER the services, materials, and <br /> by any of them) CONTRACTOR's duties and equipment CONTRACTOR proposes to provide and <br /> responsibilities for safety and for protection of the to enable ENGINEER to review the information for the <br /> Work shall continue until such time as all the Work is limited purposes required by paragraph 6.17.E. <br /> completed and ENGINEER has issued a notice to <br /> OWNER and CONTRACTOR in accordance with B CONTRACTOR shall also submit Samples to <br /> paragraph 14 07 B that the Work is acceptable ENGINEER for review and approval in accordance <br /> (except as otherwise expressly provided in connection with the acceptable schedule of Shop Drawings and <br /> with Substantial Completion) Sample submittals. Each Sample will be identified <br /> clearly as to material, Supplier, pertinent data such as <br /> 614 Safety Representative catalog numbers, and the use for which intended and <br /> otherwise as ENGINEER may require to enable ENGI- <br /> A. CONTRACTOR shall designate a qualified NEER to review the submittal for the limited purposes <br /> and experienced safety representative at the Site required by paragraph 6.17 E. The numbers of each <br /> whose duties and responsibilities shall be the Sample to be submitted will be as specified in the <br /> prevention of accidents and the maintaining and Specifications. <br /> supervising of safety precautions and programs. <br /> C Where a Shop Drawing or Sample is required <br /> 615 Hazard Communication Programs by the Contract Documents or the schedule of Shop <br /> Drawings and Sample submittals acceptable to ENGI- <br /> A. CONTRACTOR shall be responsible for NEER as required by paragraph 2.07, any related <br /> coordinating any exchange of material safety data Work performed prior to ENGINEER's review and <br /> sheets or other hazard communication information approval of the pertinent submittal will be at the sole <br /> required to be made available to or exchanged be- expense and responsibility of CONTRACTOR. <br /> tween or among employers at the Site in accordance <br /> with Laws or Regulations. D Submittal Procedures <br /> 616 Emergencies 1. Before submitting each Shop <br /> Drawing or Sample, CONTRACTOR shall have <br /> A. In emergencies affecting the safety or protec- determined and verified: <br /> tion of persons or the Work or property at the Site or <br /> adjacent thereto, CONTRACTOR is obligated to act to a. all field measurements, quantities, <br /> prevent threatened damage, injury, or loss. dimensions, specified performance criteria, <br /> CONTRACTOR shall give ENGINEER prompt written installation requirements, materials, catalog <br /> notice if CONTRACTOR believes that any significant numbers, and similar information with <br /> changes in the Work or variations from the Contract respect thereto, <br /> Documents have been caused thereby or are required <br /> as a result thereof. If ENGINEER determines that a b all materials with respect to intended <br /> change in the Contract Documents is required be- use, fabrication, shipping, handling, storage, <br /> cause of the action taken by CONTRACTOR in assembly, and installation pertaining to the <br /> response to such an emergency, a Work Change performance of the Work; <br /> Directive or Change Order will be issued <br /> c. all information relative to means, <br /> methods, techniques, sequences, and <br /> procedures of construction and safety <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-24 <br /> F Tublic Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)Vadmim\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.