My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
precautions and programs incident thereto, 3 ENGINEER's review and approval of <br /> and Shop Drawings or Samples shall not relieve <br /> CONTRACTOR from responsibility for any <br /> d CONTRACTOR shall also have variation from the requirements of the Contract <br /> reviewed and coordinated each Shop Documents unless CONTRACTOR has in <br /> Drawing or Sample with other Shop writing called ENGINEER's attention to each <br /> Drawings and Samples and with the such variation at the time of each submittal as <br /> requirements of the Work and the Contract required by paragraph 6.17 D 3 and ENGI- <br /> Documents. NEER has given written approval of each such <br /> variation by specific written notation thereof <br /> 2. Each submittal shall bear a stamp or incorporated in or accompanying the Shop <br /> specific written indication that CONTRACTOR Drawing or Sample approval; nor will any <br /> has satisfied CONTRACTOR's obligations approval by ENGINEER relieve CON- <br /> under the Contract Documents with respect to TRACTOR from responsibility for complying <br /> CONTRACTOR's review and approval of that with the requirements of paragraph 6.17.D 1 <br /> submittal. <br /> F. Resubmittal Procedures <br /> 3. At the time of each submittal, CON- <br /> TRACTOR shall give ENGINEER specific 1 CONTRACTOR shall make correc- <br /> written notice of such variations, if any, that the tions required by ENGINEER and shall return <br /> Shop Drawing or Sample submitted may have the required number of corrected copies of <br /> from the requirements of the Contract Shop Drawings and submit as required new <br /> Documents, such notice to be in a written com- Samples for review and approval. CON- <br /> munication separate from the submittal; and, in TRACTOR shall direct specific attention in <br /> addition, shall cause a specific notation to be writing to revisions other than the corrections <br /> made on each Shop Drawing and Sample sub- called for by ENGINEER on previous <br /> mitted to ENGINEER for review and approval of submittals. <br /> each such variation. <br /> 618 Continuing the Work <br /> E. ENGINEER's Review <br /> A. CONTRACTOR shall carry on the Work and <br /> 1. ENGINEER will timely review and adhere to the progress schedule during all disputes or <br /> approve Shop Drawings and Samples in disagreements with OWNER. No Work shall be <br /> accordance with the schedule of Shop delayed or postponed pending resolution of any <br /> Drawings and Sample submittals acceptable to disputes or disagreements, except as permitted by <br /> ENGINEER. ENGINEER's review and paragraph 15.04 or as OWNER and CONTRACTOR <br /> approval will be only to determine if the items may otherwise agree in writing <br /> covered by the submittals will, after installation <br /> or incorporation in the Work, conform to the 619 CONTRACTOR's General Warranty and <br /> information given in the Contract Documents Guarantee <br /> and be compatible with the design concept of <br /> the completed Project as a functioning whole as A. CONTRACTOR warrants and guarantees to <br /> indicated by the Contract Documents. OWNER, ENGINEER, and ENGINEER's Consultants <br /> that all Work will be in accordance with the Contract <br /> 2. ENGINEER's review and approval Documents and will not be defective. <br /> will not extend to means, methods, techniques, CONTRACTOR's warranty and guarantee hereunder <br /> sequences, or procedures of construction excludes defects or damage caused by- <br /> (except where a particular means, method, <br /> technique, sequence, or procedure of con- 1. abuse, modification, or improper <br /> struction is specifically and expressly called for maintenance or operation by persons other <br /> by the Contract Documents) or to safety than CONTRACTOR, Subcontractors, <br /> precautions or programs incident thereto. The Suppliers, or any other individual or entity for <br /> review and approval of a separate item as such whom CONTRACTOR is responsible; or <br /> will not indicate approval of the assembly in <br /> which the item functions. 2. normal wear and tear under normal <br /> usage. <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-25 <br /> PIPublic Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)Admim\bid documents\Nlaster Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.