My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C If ENGINEER does not render a formal 2. Cost of all materials and equipment <br /> decision in writing within the time stated in paragraph furnished and incorporated in the Work, includ- <br /> 10 05 B, a decision denying the Claim in its entirety ing costs of transportation and storage thereof, <br /> shall be deemed to have been issued 31 days after and Suppliers' field services required in <br /> receipt of the last submittal of the claimant or the last connection therewith. All cash discounts shall <br /> submittal of the opposing party, if any accrue to CONTRACTOR unless OWNER <br /> deposits funds with CONTRACTOR with which <br /> D No Claim for an adjustment in Contract Price to make payments, in which case the cash <br /> or Contract Times (or Milestones) will be valid if not discounts shall accrue to OWNER. All trade <br /> submitted in accordance with this paragraph 10 05. discounts, rebates and refunds and returns <br /> from sale of surplus materials and equipment <br /> shall accrue to OWNER, and CONTRACTOR <br /> ARTICLE 11 -COST OF THE WORK, CASH shall make provisions so that they may be <br /> ALLOWANCES; UNIT PRICE WORK obtained <br /> 3 Payments made by CONTRACTOR <br /> 11.01 Cost of the Work to Subcontractors for Work performed by <br /> Subcontractors. If required by OWNER, LON- <br /> A. Costs Included: The term Cost of the Work TRACTOR shall obtain competitive bids from <br /> means the sum of all costs necessarily incurred and subcontractors acceptable to OWNER and <br /> paid by CONTRACTOR in the proper performance of CONTRACTOR and shall deliver such bids to <br /> the Work. When the value of any Work covered by a OWNER, who will then determine, with the <br /> Change Order or when a Claim for an adjustment in advice of ENGINEER, which bids, if any, will be <br /> Contract Price is determined on the basis of Cost of acceptable. If any subcontract provides that the <br /> the Work, the costs to be reimbursed to Subcontractor is to be paid on the basis of Cost <br /> CONTRACTOR will be only those additional or of the Work plus a fee, the Subcontractor's <br /> incremental costs required because of the change in Cost of the Work and fee shall be determined <br /> the Work or because of the event giving rise to the in the same manner as CONTRACTOR's Cost <br /> Claim. Except as otherwise may be agreed to in of the Work and fee as provided in this para- <br /> writing by OWNER, such costs shall be in amounts no graph 11 01. <br /> higher than those prevailing in the locality of the <br /> Project, shall include only the following items, and 4. Costs of special consultants <br /> shall not include any of the costs itemized in para- (including but not limited to engineers, <br /> graph 1101 B. architects, testing laboratories, surveyors, <br /> attorneys, and accountants) employed for <br /> a oa„r„u for employees in +he services specifically related to the Work. <br /> 5 Supplemental costs including the <br /> r*;c;6'fiG;3tiGR6 agreed upon by OWNER and <br /> following- <br /> CONTRACTOR SunhernpleyeesrhalliRlGlude <br /> a. The proportion of necessary trans- <br /> and- A-the-F peF69nnel employed full tome at th travel, and subsistence expenses of <br /> CONTRACTOR's employees incurred in dis- <br /> charge of duties connected with the Work. <br /> the ef tie(r +�_speR+ on the \A/^rk <br /> , b. Cost, including transportation and <br /> salaries ^ �.ag@s-plas '�^ ^^^+ ^+ +r'^^^ maintenance, of all materials, supplies, equip- <br /> ment, machinery, appliances, office, and <br /> temporary facilities at the Site, and hand tools <br /> not owned by the workers,which are consumed <br /> and retirement benefits, benuses, SiGk-lea e, in the performance of the Work, and cost, less <br /> market value, of such items used but not con- <br /> The ^„non es of perfem;inn Work r,i ltcide ^+ sumed which remain the property of CON- <br /> TRACTOR. <br /> legal hG!iday6, shall be inGluded in the above to <br /> the extent a thnrized by OWNER. <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-32 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)Vadmim\bid documentsWlaster Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.