Laserfiche WebLink
C. Rentals of all construction equip- changes in the Work or caused by the event <br /> ment and machinery, and the parts thereof giving rise to the Claim. <br /> whether rented from CONTRACTOR or others <br /> in accordance with rental agreements approved j. When all the Work is performed on the <br /> by OWNER with the advice of ENGINEER, and basis of cost-plus, the costs of premiums for all <br /> the costs of transportation, loading, unloading, Bonds and insurance CONTRACTOR is <br /> assembly, dismantling, and removal thereof. required by the Contract Documents to <br /> All such costs shall be in accordance with the purchase and maintain <br /> terms of said rental agreements The rental of <br /> any such equipment, machinery, or parts shall B Costs Excluded. The term Cost of the Work <br /> cease when the use thereof is no longer shall not include any of the following items: <br /> necessary for the Work. <br /> 1. Payroll costs and other compensation <br /> d Sales, consumer, use, and other of CONTRACTOR's officers, executives, princi- <br /> similar taxes related to the Work, and for which pals (of partnerships and sole proprietorships), <br /> CONTRACTOR is liable, imposed by Laws and general managers, engineers, architects, <br /> Regulations. estimators, attorneys, auditors, accountants, <br /> purchasing and contracting agents, expediters, <br /> e Deposits lost for causes other than timekeepers, clerks, and other personnel <br /> negligence of CONTRACTOR, any Sub- employed by CONTRACTOR, whether at the <br /> contractor, or anyone directly or indirectly Site or in CONTRACTOR's principal or branch <br /> employed by any of them or for whose acts any office for general administration of the Work <br /> of them may be liable, and royalty payments and not specifically included in the agreed upon <br /> and fees for permits and licenses. schedule of job classifications referred to in <br /> paragraph 11 01.A.1 or specifically covered by <br /> f. Losses and damages (and related paragraph 11 01.A.4, all of which are to be <br /> expenses) caused by damage to the Work, not considered administrative costs covered by the <br /> compensated by insurance or otherwise, sus- CONTRACTOR's fee. <br /> tained by CONTRACTOR in connection with <br /> the performance of the Work (except losses 2. Expenses of CONTRACTOR's princi- <br /> and damages within the deductible amounts of pal and branch offices other than <br /> property insurance established in accordance CONTRACTOR's office at the Site. <br /> with paragraph 5.06 D), provided such losses <br /> and damages have resulted from causes other 3. Any part of CONTRACTOR's capital <br /> than the negligence of CONTRACTOR, any expenses, including interest on <br /> Subcontractor, or anyone directly or indirectly CONTRACTOR's capital employed for the <br /> employed by any of them or for whose acts any Work and charges against CONTRACTOR for <br /> of them may be liable. Such losses shall delinquent payments. <br /> include settlements made with the written <br /> consent and approval of OWNER. No such 4 Costs due to the negligence of CON- <br /> losses, damages, and expenses shall be TRACTOR, any Subcontractor, or anyone <br /> included in the Cost of the Work for the directly or indirectly employed by any of them or <br /> purpose of determining CONTRACTOR's fee. for whose acts any of them may be liable, <br /> including but not limited to, the correction of <br /> g. The cost of utilities, fuel, and sanitary defective Work, disposal of materials or <br /> facilities at the Site. equipment wrongly supplied, and making good <br /> any damage to property <br /> h. Minor expenses such as telegrams, <br /> long distance telephone calls, telephone service 5 Other overhead or general expense <br /> at the Site, expressage, and similar petty cash costs of any kind and the costs of any item not <br /> items in connection with the Work. specifically and expressly included in <br /> paragraphs 11.01.A and 11.01.B. <br /> i. When the Cost of the Work is used to <br /> determine the value of a Change Order or of a C CONTRACTOR's Fee. When all the Work is <br /> Claim, the cost of premiums for additional performed on the basis of cost-plus, CONTRACTOR's <br /> Bonds and insurance required because of the fee shall be determined as set forth in the Agreement. <br /> When the value of any Work covered by a Change <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-33 <br /> F-\Public Works\ENGINEERING DIVISION PROJECTSXOB45B-Old Dixie Hwy Sidewalk(38th Ln-45th St)V\dmim\bid documentswaster Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />