My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
any other provision of the Contract Documents, <br /> OWNER may, after seven days written notice to <br /> CONTRACTOR, correct and remedy any such <br /> deficiency. <br /> C. Where defective Work (and damage to other <br /> Work resulting therefrom) has been corrected or B. In exercising the rights and remedies under <br /> removed and replaced under this paragraph 13 07, this paragraph, OWNER shall proceed expeditiously <br /> the correction period hereunder with respect to such In connection with such corrective and remedial <br /> Work will be extended for an additional period of one action, OWNER may exclude CONTRACTOR from all <br /> year after such correction or removal and replacement or part of the Site, take possession of all or part of the <br /> has been satisfactorily completed. Work and suspend CONTRACTOR's services related <br /> thereto, take possession of CONTRACTOR's tools, <br /> D. CONTRACTOR's obligations under this appliances, construction equipment and machinery at <br /> paragraph 13.07 are in addition to any other obligation the Site, and incorporate in the Work all materials and <br /> or warranty. The provisions of this paragraph 13 07 equipment stored at the Site or for which OWNER has <br /> shall not be construed as a substitute for or a waiver paid CONTRACTOR but which are stored elsewhere. <br /> of the provisions of any applicable statute of limitation CONTRACTOR shall allow OWNER, OWNER's <br /> or repose. representatives, agents and employees, OWNER's <br /> other contractors, and ENGINEER and ENGINEER's <br /> 13 08 Acceptance of Defective Work Consultants access to the Site to enable OWNER to <br /> exercise the rights and remedies under this <br /> A. If, instead of requiring correction or removal paragraph. <br /> and replacement of defective Work, OWNER (and, <br /> prior to ENGINEER's recommendation of final pay- C. All Claims, costs, losses, and damages <br /> ment, ENGINEER) prefers to accept it, OWNER may (including but not limited to all fees and charges of <br /> do so CONTRACTOR shall pay all Claims, costs, engineers, architects, attorneys, and other <br /> losses, and damages (including but not limited to all professionals and all court or arbitration or other <br /> fees and charges of engineers, architects, attorneys, dispute resolution costs) incurred or sustained by <br /> and other professionals and all court or arbitration or OWNER in exercising the rights and remedies under <br /> other dispute resolution costs) attributable to this paragraph 13 09 will be charged against CON- <br /> OWNER's evaluation of and determination to accept TRACTOR, and a Change Order will be issued <br /> such defective Work (such costs to be approved by incorporating the necessary revisions in the Contract <br /> ENGINEER as to reasonableness)and the diminished Documents with respect to the Work; and OWNER <br /> value of the Work to the extent not otherwise paid by shall be entitled to an appropriate decrease in the <br /> CONTRACTOR pursuant to this sentence. If any Contract Price If the parties are unable to agree as to <br /> such acceptance occurs prior to ENGINEER's recom- the amount of the adjustment, OWNER may make a <br /> mendation of final payment, a Change Order will be Claim therefor as provided in paragraph 10.05 Such <br /> issued incorporating the necessary revisions in the claims, costs, losses and damages will include but not <br /> Contract Documents with respect to the Work, and be limited to all costs of repair, or replacement of work <br /> OWNER shall be entitled to an appropriate decrease of others destroyed or damaged by correction, <br /> in the Contract Price, reflecting the diminished value of removal, or replacement of CONTRACTOR's <br /> Work so accepted If the parties are unable to agree defective Work. <br /> as to the amount thereof, OWNER may make a Claim <br /> therefor as provided in paragraph 10.05. If the D CONTRACTOR shall not be allowed an <br /> acceptance occurs after such recommendation, an extension of the Contract Times (or Milestones) <br /> appropriate amount will be paid by CONTRACTOR to because of any delay in the performance of the Work <br /> OWNER. attributable to the exercise by OWNER of OWNER's <br /> rights and remedies under this paragraph 13.09. <br /> 13 09 OWNER May Correct Defective Work <br /> A. If CONTRACTOR fails within a reasonable <br /> time after written notice from ENGINEER to correct <br /> defective Work or to remove and replace rejected <br /> Work as required by ENGINEER in accordance with <br /> paragraph 13 06.A, or if CONTRACTOR fails to <br /> perform the Work in accordance with the Contract <br /> Documents, or if CONTRACTOR fails to comply with <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-38 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS1084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admlm\bid documentsWaster Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.