My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01009 <br /> SPECIAL PROVISIONS <br /> 1.1 GENERAL <br /> A. Visits to the construction site may be made by representatives of permitting or <br /> governing bodies. Submit details of all instructions from the above to the ENGINEER <br /> immediately. The Work will not be accepted by the OWNER until final acceptance has <br /> been received from the various Regulatory Agencies having jurisdiction. <br /> B. Furnish sufficient labor, construction equipment and materials, and work such hours, <br /> including night shifts and overtime operations, as may be necessary to insure the <br /> prosecution of the work in accordance with the approved progress schedule. If, in the <br /> opinion of the ENGINEER, the CONTRACTOR falls behind the progress schedule, take <br /> such steps as may be necessary to improve progress, all without additional cost to the <br /> OWNER. The ENGINEER shall be compensated for his overtime services in <br /> accordance with the Supplementary Conditions, SC-6.02. <br /> C. All salvageable material and equipment for which specific use, relocation or other <br /> disposal is not specifically noted, shall remain the property of the OWNER and shall be <br /> delivered to the OWNER at the following location: 4550 41St Street, at the <br /> CONTRACTOR's expense. All material and equipment not in salvageable condition, as <br /> determined by the ENGINEER and the OWNER, shall be disposed of by the <br /> CONTRACTOR, at the CONTRACTOR's expense. <br /> D. In addition to these Specifications all work must comply with the requirements of the <br /> local governing agency, St. Johns River Water Management District, Department of <br /> Environmental Protection, Army Corps of Engineers, Indian River Farms Water Control <br /> District, and all other applicable State or Federal agencies' specifications and permits. <br /> In the event of a conflict, the more stringent specification or requirement shall govern. <br /> E. Before performing any work outside the designated limits of the work site, secure any <br /> necessary permits and authorization from the applicable owner, or verify in writing that <br /> such has been previously obtained. Follow all requirements of any said permits or <br /> authorization. Give the ENGINEER and appropriate owner ten (10) days minimum <br /> notice before commencing construction operations outside the designated limits of the <br /> work site. <br /> 01009-1 01009-Special Provisions <br /> F•\Public Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documentsWlaster Contract <br /> Documents\01009-Special Provisions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.