My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01024 <br /> FORCE ACCOUNT <br /> 1.1 General <br /> CONTRACTOR shall furnish all labor, materials, equipment and incidentals <br /> necessary to perform additional work not covered on the Contract Drawings. <br /> The force Account is intended as a contingency for unforeseen work. <br /> 1_1 PAYMENT <br /> A. Lump sum amount for force account work is included in the bid schedule. <br /> The value of force account work will be determined in accordance with Article <br /> 12 of the General Conditions. <br /> + + END OF SECTION + + <br /> 01024- 1 <br /> F•\Public Works\ENGINEERING DIVISION PROJECTS\084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid <br /> documents\Master Contract Documents\01024-Force Account.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.