My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed, <br /> destroyed, or damaged during construction. Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction. <br /> H. When finished surfaces require cleaning with cleaning materials, use only <br /> those cleaning materials which will not create hazards to health or <br /> property and which will not damage the surfaces. Use cleaning materials <br /> only on those surfaces recommended by the manufacturer. Follow the <br /> manufacturer's directions and recommendations at all times. <br /> I. Keep the amount of dust produced during construction activities to a <br /> minimum. At CONTRACTOR's expense, spray water or other dust control <br /> agents over the areas, which are producing the dust. Schedule <br /> construction operations so that dust and other contaminants will not fall on <br /> wet or newly coated surfaces. <br /> 1.3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion, the OWNER, ENGINEER, and CONTRACTOR shall <br /> review the site with regards to site cleanup and restoration. Clean and/or restore <br /> all items determined to be unsatisfactory by the OWNER or ENGINEER, at no <br /> additional expense. <br /> + + END OF SECTION + + <br /> 01710 Site Cleanup <br /> 01710-2 <br /> F\Public Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Hdmim\bid documentsWlaster Contract <br /> Documents\01710-Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.