My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01820 <br /> Post Final Inspection <br /> 1.1 GENERAL <br /> A. Approximately one year after Final Completion, the OWNER will make <br /> arrangements with the Construction Coordination Manager and the <br /> CONTRACTOR for a post final inspection and will send a written notice to said <br /> parties to inform them of the date and time of the inspection. <br /> B. Corrections of defective work noted by OWNER and Construction Coordination <br /> Manager shall comply with the applicable sections of Article 13, General <br /> Conditions. <br /> C. After the inspection, the OWNER will inform the CONTRACTOR of any <br /> corrections required to release the performance and payment bonds. <br /> * * END OF SECTION <br /> 001820-Post Final Inspection rev 05-13.doc <br /> 001820- 1 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS10845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documentsWlaster Contract Documents\001820-Post <br /> Final Inspection rev 05-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.