My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025C
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 3:25:42 PM
Creation date
4/26/2016 1:11:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025C
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 3
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The contractor will also be required to provide, prior to incorporating the materials into the Project, <br />certifications from the producer of steel or iron, or any produce containing steel or iron as a component, <br />stating that all steel or iron furnished was produced entirely within the United States or was produced <br />within the United States except for minimal quantities of foreign steel and iron valued at ($insert actual <br />value) <br />18. DISADVANTAGED BUSINESS ENTERPRISE PROGRAM <br />(1) Policy. The contractor shall ensure that Disadvantaged Business Enterprises, as <br />defined in 49 C.F.R. Part 26, as amended, shall have the opportunity to participate in the performance of this <br />project. In this regard, the contractor shall take all necessary and reasonable steps in accordance with <br />applicable federal and state regulations, to ensure that the Disadvantaged Business Enterprises have the <br />opportunity to compete for and perform contracts or subcontracts with respect to this Project. <br />(2) DBE Availability Goal Percentage. The DBE Goal Percentage for this project is 7.9%. <br />This DBE availability goal percentage is not a mandatory contract specification, but it is a guide to inform <br />the contractor of the work that could reasonably be contracted to a DBE. <br />(3) DBE Certification Only DBE firm(s) certified by the FDOT Equal Opportunity Office <br />shall be considered disadvantaged business enterprises for the purposes of this bid and any resulting <br />contract. To verify whether a firm is certified as a DBE for the work being performed, the contractor must <br />refer to the DBE Directory published by the FDOT Equal Opportunity Office on the Internet at: <br />www.dot.state.fl.us/equalopportunityoffice/ or through the Florida Unified Certification Program at <br />www.bipincwebapps.com/biznetflorida/. If the Internet is not available, call the Equal Opportunity Office <br />for verification at (850) 414-4747. <br />(4) Anticipated DBE Participation Statement. Contractor shall complete and submit the <br />Anticipated DBE Participation Statement prior to the pre -construction conference through the FDOT Equal <br />Opportunity Office on the Internet. A hard copy of the Statement should also be provided the pre -construction <br />conference The Statement must only include companies certified as a DBE The Statement can and should <br />be updated when additions or deletions are made through the life of the contract. This will not become a <br />mandatory part of the contract. <br />When reporting anticipated DBE utilization or actual payments, the following guidelines prescribed in <br />the 49 C F R. Part 26 shall apply: <br />a) When a DBE participates in a contract, count only the value of the work actually <br />performed by the DBE toward DBE participation. <br />b) Count expenditures to a DBE contractor toward DBE goals only if the DBE is <br />performing a commercially useful function on the project. <br />c) Follow the DBE reporting guidelines established by FDOT. <br />(5) Reporting Contractor shall report monthly, through the FDOT Equal Opportunity <br />Reporting System on the FDOT website, actual payment, retainage, DBE status and work type of all <br />subcontractors and major suppliers. Contractor shall develop a record keeping system to monitor DBE <br />participation including the following. <br />i) number and dollar value of contracts awarded to DBE subcontractors. <br />ii) a description of the general categories of subcontracts awarded to DBEs. <br />iii) the specific efforts employed to identify and award subcontracts to DBEs. <br />All records relating to DBE participation and subcontracts shall be maintaihed for a period of five (5) years <br />following acceptance of final payment. All such records shall be available for inspection by the County, FDOT <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.