My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025C
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 3:25:42 PM
Creation date
4/26/2016 1:11:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025C
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 3
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or the Federal Highway Administration upon request. <br />19. BID OPPORTUNITY LIST. <br />Federal regulations require the bidder to report on all firms that bid or quote subcontracts on FDOT- <br />assisted projects, including both DBEs and non -DBEs. The Bid Opportunity List form must be completed by <br />all bidders identifying ALL subcontractor who quoted to bidder for this project and contract. A form Bid <br />Opportunity List form is attached and must be submitted with the bid proposal. <br />20 NON -COLLUSION <br />Bidder shall submit the included Non -Collusion Certification with its bid proposal, certifying that the <br />bidder has not, either directly or indirectly, entered into any agreement, participated in any collusion, or <br />otherwise taken any action, in restraint of free competitive bidding in connection with its bid. <br />Failure to submit the certification with the bid will make the bid non-responsive and not eligible for <br />award consideration <br />21 STANDARDIZED CHANGED CONDITIONS CLAUSE <br />(1) Differing site conditions. <br />a) During the progress of the work, if subsurface or latent physical conditions are <br />encountered at the site differing materially from those indicated in the contract or if <br />unknown physical conditions of an unusual nature, differing materially form those <br />ordinarily encountered and generally recognized as inherent in the work provided for <br />in the contract re encountered at the site, the party discovery such conditions shall <br />promptly notify the other party in writing of the specific differing conditions before the <br />site is disturbed and before the affected work is performed. <br />b) Upon written notification, the engineer will investigate the conditions, and if it is <br />determined that the conditions materially differ and cause an increase or decrease in <br />the cost or time required for the performance of any work under the contact, an <br />adjustment, excluding anticipated profits, will be made and the contract modified in <br />writing accordingly The engineer will notify the contractor of the determination <br />whether or not an adjustment of the contract is warranted <br />c) No contract adjustment which results in a benefit to the contractor will be allowed <br />unless the contractor has provided the required written notice. <br />d) No contract adjustment will be allowed under this clause for any effects caused on <br />unchanged work. <br />(2) Suspensions of work ordered by the engineer. <br />a) If the performance of all or any portion of the work is suspended or delayed by the <br />engineer in writing for an unreasonable period of time (not originally anticipated, <br />customary, or inherent to the construction industry) and the contractor believes that <br />additional compensation and/or contract time is due as a result of such suspension <br />or delay, the contractor shall submit to the engineer in writing a request for <br />adjustment within 7 calendar days of receipt of the notice to resume work. The <br />request shall set forth the reasons and support for such adjustment. <br />b) Upon receipt, the engineer will evaluate the contractor's request. If the engineer <br />agrees that the cost and/or time required for the performance of the contract has <br />increased as a result of such suspension and the suspension was caused by <br />conditions beyond the control of and not the fault of the contractor, its suppliers, or <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.