My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025C
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 3:25:42 PM
Creation date
4/26/2016 1:11:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025C
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 3
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
project. <br />The bidder agrees by submitting its bid that should it be awarded the contract, it will not knowingly enter into <br />any sub -contracts for this project with a person who is debarred, suspended, declared ineligible or excluded <br />from participation in this transaction The bidder further agrees that it will require the same certification in all <br />solicitations for and from all sub -contractors on the project. <br />The certification is a material representation of fact upon which the County will rely. If it is later determined <br />that the bidder rendered an erroneous certification, or knowingly entered into a sub -contract with a <br />subcontractor who is debarred, suspended or ineligible, the County may terminate the contract for cause of <br />default. <br />28 EQUIPMENT <br />(1) Publicly Owned Equipment * The policy definition of publicly owned equipment is " . <br />. equipment previously purchased or otherwise acquired by the public agency involved for use in its own <br />operations." the policy goes on to state that ". publicly owned equipment should not normally compete <br />with privately owned equipment on a project to be let to contract." <br />(2) Equipment Rental Rates. Contractor shall comply with the cost principles and <br />procedures set forth in 48 C F R. Part 31 Reasonable costs of renting construction equipment are allowable; <br />but the allowability of charges of equipment rentals from any division, subsidiary of organization under <br />common control of contractor will be determined in accordance with 48 C.F.R. Sec 31.205-36(b)(3) <br />29. MATERIALS <br />(1) Source of Supply; Convict Labor. Materials produced by convict labor are prohibited <br />from use on this project unless specific written authority for such use is obtained from FDOT and. (i) such <br />materials are produced by convicts on parole, supervised release, or probation from a prison <br />(2) No Local Preference. The contractor must furnish all materials to be incorporated in the <br />work, and the contractor shall be permitted to select the sources from which the materials are to be obtained <br />The County shall not impose any requirement or enforce any procedure which operates to require the use of, <br />or provides a price differential in favor of, articles or materials produced within the State. <br />30. SALVAGE CREDITS. <br />There will be no credit to the project as a result of salvaged materials or equipment. <br />31. SUBCONTRACTING <br />(1) Prime Contractor Requirement. The prime contractor shall perform at least 30 percent of <br />contract work with its own organization. This percentage shall be of the original contract price, exclusive of <br />specialty items, but include the cost of materials and manufactured products purchased or produced by the <br />prime contractor <br />(2) Subcontract approval. No portion of the work may be sublet, assigned, or otherwise <br />subcontracted without the written consent of the County Subcontract approval shall be based on satisfactory <br />evidence that each subcontract is in writing and contains all the pertinent provisions. The approval of a <br />subcontract does not relieve the contractor of responsibility for fulfillment of the contract. <br />32. ACCESS TO RECORDS <br />(1) The Contractor agrees to provide the County, FDOT, FHWA, the Comptroller General of the <br />United States or any of their authorized representatives access to any books, documents, <br />papers and records of the Contractor which are directly pertinent to the contract for the <br />purposes of making audits, examinations, excerpts and transcriptions. <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.