My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025C
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 3:25:42 PM
Creation date
4/26/2016 1:11:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025C
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 3
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GC 31 INSPECTION. <br />Engineer The Owner may provide Engineering personnel for the observation of the work. The <br />Owner, Engineer and their representatives shall at all times have access to the work whenever it is in <br />preparation or progress, and the Contractor shall provide proper facilities for such access and for inspection. <br />If the specifications, the Engineer's instructions, applicable laws, ordinances, or any public authority require <br />any work to be specially tested or approved, the Contractor shall give the Engineer timely notice of its <br />readiness for observation and, if the observation is by another authority than the Engineer, of the date fixed for <br />such observation. If any work should be covered up prior to any quality inspection or test by Owner or <br />Engineer, it must, if required by the Engineer, be uncovered for inspection and properly restored at the <br />Contractor's expense <br />GC 32 TESTING <br />Unless otherwise provided in the Contract, drawings or specifications, shop testing of material or work <br />shall be performed by the Contractor at its expense and in accordance with the technical specifications. <br />Should tests in addition to those required by the specifications be desired by Owner, Contractor will be advised <br />in reasonable time to permit such additional testing at Owner's expense, unless additional tests are required <br />due to Contractor's work or materials having failed any initial test. Contractor shall furnish samples as <br />requested and shall provide reasonable assistance and cooperation necessary to permit tests to be performed <br />on materials or work in place, including reasonable stoppage of work during testing. <br />GC 33 SUBSTITUTION. <br />The naming of a specified product of specific manufacturers for equipment or materials under the <br />various items of specifications or as shown on the plans shall be interpreted as establishing a minimum <br />standard of quality and performance. It shall not be construed as eliminating the selection of other than the <br />named equipment or materials equal to those specified, unless the materials are specifically designated as not <br />permitting substitution <br />Prior to proposing any substitute item, Contractor shall satisfy itself that the item proposed is equal or <br />better to that specified, that such item will fit into the space allocated, that such item affords comparable ease <br />of operation , maintenance and service, that the appearance, longevity and suitability for the climate are <br />comparable, that by reason of costs savings, reduced construction time or similar demonstrable benefit, the <br />substitution of such item will be in Owner's interest and will in no way detrimentally impact the project <br />schedule. The burden of proof that such an item offered is equal in all respects to that specified shall be the <br />Contractor's. Contractor shall submit drawings, samples, data and additional information as may be required <br />by Owner. All requests for substitutions, with supporting information, shall be submitted by and at the expense <br />of Contractor. At least 35 days shall be allowed for Owner's review <br />The Owner or its Engineer shall make the determination as to the acceptability of any substitution <br />Approval of a substitution shall not relieve Contractor from the responsibility for compliance with all <br />requirements of the Contractor Contractor shall coordinate the change with all trades and bear the expense <br />for any changes in other parts of the work caused by any substitution <br />Contractor may make only two requests for substitution in the same category and Contractor shall be <br />invoiced the expenses incurred by Owner for its design professionals in reviewing additional substitution <br />requests, unless otherwise approved by Owner. <br />GC 34 CORRECTION OF DEFECTIVE MATERIALS OR WORKMANSHIP <br />If any material, equipment or workmanship is determined by Owner, either during performance of the <br />work, during final quality inspection or during the warranty period, to be defective or non in compliance with the <br />specifications and the Contract, Owner shall notify Contractor in writing that such material, equipment or work <br />is rejected and the Owner reserve the right to withhold payment on any such item. Contractor shall, at its own <br />expense, immediately remove and replace or correct such defective material, equipment or work by making <br />the same strictly comply with all requirements of the drawings, specifications and contract. If Owner or <br />Engineer deems it inexpedient to correct work that has been damaged or that was not performed in <br />accordance with the drawings, specifications and contract, an equitable deduction from the contract price shall <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.