Laserfiche WebLink
525-010-44 �7 <br />SPECIFICATIONS 8 ESTIMATES <br />08/14 <br />Page 6 of 6 <br />Requirement <br />Reference <br />Local Agency Responsibilities <br />District Monitoring <br />Responsibilities <br />Requirement ocation <br />38 Time Extensions <br />23 CFR <br />635.121 - <br />Include reasons time extensions are allowed in specifications. <br />May use Section 8:7 3.2 of the FDOT Standard Specifications. <br />Review bid document for inclusion <br />of the provision. <br />Appendix "C" p 22 #23 <br />39 Warranty Clauses <br />23 CFR <br />635 413 <br />Warranty provisions shall be for a specific construction product <br />or feature. Items of maintenance are not eligible for federal <br />projects and shall not be covered General condition <br />warranties for an entire project are not allowed Transfer of <br />product warranties is allowed. <br />Warranty provisions on a NHS project must be approved by <br />FHWA. Warranty provisions on the SHS or off the SHS must <br />adhere to FDOT CPAM Chapter 8 <br />Review bid document for inclusion <br />of warranty clauses. Remove all <br />general condition warranty clauses <br />from PS&E Package <br />Bidding Documents General <br />Conditions Arti le 6 19 page 25 <br />Local Agency. I hereby certify that the above mentioned LAP project construction contract documents contain the provisions set forth in this checklist. <br />// <br />Signatur <br />Name (Printed) / <br />District LAP Administrator/Designee I hereby certify that the above mentioned LAP project construction contract documents contain the provisions set forth in this <br />checklist. �. <br />osition Title <br />bate <br />. ,h . <br />Signature Position Title <br />e/A1 el I <br />Name (Printed) Date <br />