Laserfiche WebLink
CLIENT: <br />PROJECT: <br />DESCRIPTION: <br />Indian River County <br />State Road 60 and 43rd Avenue Intersection Improvements <br />Level 3 Contamination Assessment <br />TOTAL ESTIMATED PROJECT COST: $59,000.00 <br />ITEM DESCRIPTION <br />UNITS <br />NUMBER <br />UNITS <br />COST PER <br />UNIT <br />EXTENSION <br />ITEM DESCRIPTION <br />UNITS <br />NUMBER <br />UNITS <br />COST PER <br />UNIT <br />EXTENSION <br />PERSONNEL <br />GENERAL FIELD EQUIPMENT AND EXPENDABLES <br />Senior Project Engineer <br />Per Hour <br />80 <br />$115.00 <br />$9,200.00 <br />Project Engineer <br />Per Hour <br />15 <br />$95.00 <br />$1,425.00 <br />Staff Engineer <br />Per Hour <br />$85.00 <br />Generator <br />Per Day <br />5 <br />$95.00 <br />$475.00 <br />Mobilization of Concerte Coring Equipment <br />Per Trip <br />5 <br />$150.00 <br />$750.00 <br />Senior Field Technician <br />Per Hour <br />80 <br />$50.00 <br />$4,000.00 <br />Peristaltic Purging Pump <br />Per Day <br />10 <br />$40.00 <br />$400.00 <br />Field Technician <br />Per Hour <br />80 <br />$45.00 <br />$3,600.00 <br />Water Level Indicator <br />Per Day <br />10 <br />S20.00 <br />$200.00 <br />Senior Technical Draftsman <br />Per Hour <br />$55.00 <br />Technical Draftsman <br />Per Hour <br />8 <br />$50.00 <br />$400.00 <br />pH/conductivity Meter <br />Per Day <br />10 <br />$25.00 <br />$250.00 <br />Technical Secretary <br />Per Hour <br />2 <br />$45.00 <br />$90.00 <br />Turbidity Meter <br />Per Day <br />10 <br />$55.00 <br />$550.00 <br />Subtotal: <br />$18,715.00 <br />Dissolved Oxygen Meter <br />Per Day <br />10 <br />$55.00 <br />$550.00 <br />DRILLING <br />MOBILIZATION/DEMOBILIZATION <br />Lump Sum Men and Equipment Mob. <br />Per Mob. <br />2 <br />$250.00 <br />$500.00 <br />Tygon Tubing <br />Per Foot <br />40 <br />$2.50 <br />$100.00 <br />Polyethylene Tubing <br />Per Foot <br />800 <br />$0.60 <br />$480.00 <br />Deionized Water (decontamination) <br />Per 5 Gal. <br />2 <br />$14.00 <br />$28.00 <br />55 -gallon Drum <br />Each <br />4 <br />$65.00 <br />$260.00 <br />Subtotal: <br />$4,043.00 <br />COMPACTION AND GRAIN SIZE TESTS <br />Standard Proctor (ASTM D-698) <br />Per Test <br />$85.00 <br />Modified Proctor (ASTM 0-1557) <br />Per Test <br />$85.00 <br />Sieve Analysis (ASTM D-421, D-422) <br />Per Test <br />$65.00 <br />Percent Fines (ASTM D-1140) <br />Per Test <br />$35.00 <br />Subtotal: <br />$0.00 <br />ANALYTICAL LABORATORY ANALYSIS <br />(Cost plus 15%) <br />EPA 8021 VOCs - water <br />Per Test <br />40 <br />$69.00 <br />$2,760.00 <br />EPA 8021 VOCs - soil <br />Per Test <br />5 <br />$69.00 <br />$345.00 <br />MONITORING WELL INSTALLATION <br />Temporary 2" PVC Wellpoint <br />Per Foot <br />500 <br />$18.00 <br />$9,000.00 <br />EPA 8270 PAI -Ea - water or soil <br />Per Test <br />45 <br />$103.50 <br />$4,657.50 <br />TRPH by FL -PRO - water or soil <br />Per Test <br />45 <br />$80.50 <br />$3,622.50 <br />DRILLING ON TIME BASIS <br />Decontamination of Equipment <br />Per Hour <br />20 <br />$150.00 <br />$3,000.00 <br />Drumming Contaminated Soil (w/o Disp) <br />Per Drum <br />4 <br />$150.00 <br />$600.00 <br />EPA 8081A (Organochlorine Pest.) <br />Per Test <br />5 <br />$143.75 <br />$718.75 <br />Drum Disposal (non hazardous) <br />Per Drum <br />4 <br />$150.00 <br />$600.00 <br />EPA 8082 (PCB) <br />Per Test <br />5 <br />$143.75 <br />$718.75 <br />EPA 8141A (Organophosphorus Pest.) <br />Per Test <br />5 <br />$126.50 <br />$632.50 <br />EPA 8151A (Herbicides) <br />Per Test <br />5 <br />$218.50 <br />$1,092.50 <br />RCRA 8 Metals <br />Per Test <br />5 <br />$88.55 <br />$442.75 <br />Sample Disposal Cost (Lump Sum) <br />Lump Sum <br />1 <br />$51.75 <br />$51.75 <br />Direct Push Groundwater Sampling <br />Per Day <br />5 <br />$1,500.00 <br />$7,500.00 <br />Subtotal: $21,200.00 <br />Subtotal: $15,042.00 <br />13-5402 Level 3 Cost Estimate.xls <br />Ardaman & Associat <br />nueliAm Geotechnical, Environmenta <br />Printed 2/2/2015 at 12:12 PM <br />