My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-053
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 12:20:20 PM
Creation date
4/28/2016 9:19:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/10/2015
Control Number
2015-053
Agenda Item Number
8.E.
Entity Name
Ardaman and Associates
Subject
Work Order No.1
Area
18th St. to 26th St.
Project Number
0853
Alternate Name
Field and Laboratory Quality Control for 43rd Ave and SR 60
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIENT: <br />PROJECT: <br />DESCRIPTION: <br />Indian River County <br />State Road 60 and 43rd Avenue Intersection Improvements <br />Level 3 Contamination Assessment <br />TOTAL ESTIMATED PROJECT COST: $59,000.00 <br />ITEM DESCRIPTION <br />UNITS <br />NUMBER <br />UNITS <br />COST PER <br />UNIT <br />EXTENSION <br />ITEM DESCRIPTION <br />UNITS <br />NUMBER <br />UNITS <br />COST PER <br />UNIT <br />EXTENSION <br />PERSONNEL <br />GENERAL FIELD EQUIPMENT AND EXPENDABLES <br />Senior Project Engineer <br />Per Hour <br />80 <br />$115.00 <br />$9,200.00 <br />Project Engineer <br />Per Hour <br />15 <br />$95.00 <br />$1,425.00 <br />Staff Engineer <br />Per Hour <br />$85.00 <br />Generator <br />Per Day <br />5 <br />$95.00 <br />$475.00 <br />Mobilization of Concerte Coring Equipment <br />Per Trip <br />5 <br />$150.00 <br />$750.00 <br />Senior Field Technician <br />Per Hour <br />80 <br />$50.00 <br />$4,000.00 <br />Peristaltic Purging Pump <br />Per Day <br />10 <br />$40.00 <br />$400.00 <br />Field Technician <br />Per Hour <br />80 <br />$45.00 <br />$3,600.00 <br />Water Level Indicator <br />Per Day <br />10 <br />S20.00 <br />$200.00 <br />Senior Technical Draftsman <br />Per Hour <br />$55.00 <br />Technical Draftsman <br />Per Hour <br />8 <br />$50.00 <br />$400.00 <br />pH/conductivity Meter <br />Per Day <br />10 <br />$25.00 <br />$250.00 <br />Technical Secretary <br />Per Hour <br />2 <br />$45.00 <br />$90.00 <br />Turbidity Meter <br />Per Day <br />10 <br />$55.00 <br />$550.00 <br />Subtotal: <br />$18,715.00 <br />Dissolved Oxygen Meter <br />Per Day <br />10 <br />$55.00 <br />$550.00 <br />DRILLING <br />MOBILIZATION/DEMOBILIZATION <br />Lump Sum Men and Equipment Mob. <br />Per Mob. <br />2 <br />$250.00 <br />$500.00 <br />Tygon Tubing <br />Per Foot <br />40 <br />$2.50 <br />$100.00 <br />Polyethylene Tubing <br />Per Foot <br />800 <br />$0.60 <br />$480.00 <br />Deionized Water (decontamination) <br />Per 5 Gal. <br />2 <br />$14.00 <br />$28.00 <br />55 -gallon Drum <br />Each <br />4 <br />$65.00 <br />$260.00 <br />Subtotal: <br />$4,043.00 <br />COMPACTION AND GRAIN SIZE TESTS <br />Standard Proctor (ASTM D-698) <br />Per Test <br />$85.00 <br />Modified Proctor (ASTM 0-1557) <br />Per Test <br />$85.00 <br />Sieve Analysis (ASTM D-421, D-422) <br />Per Test <br />$65.00 <br />Percent Fines (ASTM D-1140) <br />Per Test <br />$35.00 <br />Subtotal: <br />$0.00 <br />ANALYTICAL LABORATORY ANALYSIS <br />(Cost plus 15%) <br />EPA 8021 VOCs - water <br />Per Test <br />40 <br />$69.00 <br />$2,760.00 <br />EPA 8021 VOCs - soil <br />Per Test <br />5 <br />$69.00 <br />$345.00 <br />MONITORING WELL INSTALLATION <br />Temporary 2" PVC Wellpoint <br />Per Foot <br />500 <br />$18.00 <br />$9,000.00 <br />EPA 8270 PAI -Ea - water or soil <br />Per Test <br />45 <br />$103.50 <br />$4,657.50 <br />TRPH by FL -PRO - water or soil <br />Per Test <br />45 <br />$80.50 <br />$3,622.50 <br />DRILLING ON TIME BASIS <br />Decontamination of Equipment <br />Per Hour <br />20 <br />$150.00 <br />$3,000.00 <br />Drumming Contaminated Soil (w/o Disp) <br />Per Drum <br />4 <br />$150.00 <br />$600.00 <br />EPA 8081A (Organochlorine Pest.) <br />Per Test <br />5 <br />$143.75 <br />$718.75 <br />Drum Disposal (non hazardous) <br />Per Drum <br />4 <br />$150.00 <br />$600.00 <br />EPA 8082 (PCB) <br />Per Test <br />5 <br />$143.75 <br />$718.75 <br />EPA 8141A (Organophosphorus Pest.) <br />Per Test <br />5 <br />$126.50 <br />$632.50 <br />EPA 8151A (Herbicides) <br />Per Test <br />5 <br />$218.50 <br />$1,092.50 <br />RCRA 8 Metals <br />Per Test <br />5 <br />$88.55 <br />$442.75 <br />Sample Disposal Cost (Lump Sum) <br />Lump Sum <br />1 <br />$51.75 <br />$51.75 <br />Direct Push Groundwater Sampling <br />Per Day <br />5 <br />$1,500.00 <br />$7,500.00 <br />Subtotal: $21,200.00 <br />Subtotal: $15,042.00 <br />13-5402 Level 3 Cost Estimate.xls <br />Ardaman & Associat <br />nueliAm Geotechnical, Environmenta <br />Printed 2/2/2015 at 12:12 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.