Laserfiche WebLink
ATTACHMENT A <br />GRANT WORK PLAN <br />Project Title: Wabasso Beach (Sector 3) Restoration Project. <br />Project Location: Between R20 and R51.3 in Indian River County. <br />Project Background: Restoration of approximately 6.1 miles of shoreline between DEP Monuments R20 - R51.3 <br />in Indian River County (Sector 3). Phase 1 construction was completed in 2010. Phase 2 construction was initiated <br />in 2011 and completed in 2012. <br />The PROJECT shall be conducted in accordance with the terms and conditions set forth under this Agreement, all <br />applicable DEPARTMENT permits and the eligible project task items established below. All data collection and <br />processing, and the resulting product deliverables, shall comply with the standards technical specifications <br />contained in the DEPARTMENT'S Monitoring Standards for Beach Erosion Control Projects (2014) and Processing <br />Plan and Geographic Information System Guidelines, unless otherwise specified in the approved Scope of Work <br />(herein after referred to as SOW) for an eligible PROJECT item. This plan may be found at <br />http://www.dep.state.fl.us/beaches/publications/pdf/PhysicalMonitoringStandards.pd£. One (1) electronic copy of <br />all written reports developed under this Agreement shall be forwarded to the DEPARTMENT, unless otherwise <br />specified. <br />The DEPARTMENT and the LOCAL SPONSOR agree that the estimated costs of the PROJECT are identified in <br />Table 1 below: <br />TABLE 1 <br />Estimated Eligible Project Cost <br />Task # <br />Eligible Project Tasks <br />State <br />Cost <br />Share <br />(%) <br />Federal <br />Estimated <br />Project Costs <br />DEP <br />Local <br />Total <br />3.0 <br />Construction <br />$4,969,919.00 <br />$4,969,919.00' <br />$9,939,838.00 <br />3.1 <br />Restoration Construction <br />50.00% <br />Subtotal <br />$4,969,919.00 <br />$4,969,919.00 <br />$9,939,838.00 <br />4.0 <br />Monitoring <br />4.1 <br />2014 Post Construction • <br />Physical Monitoring <br />50.00% <br />$33,062.50 <br />$33,062.50 <br />$66,125.00 <br />4.2 <br />2014 Biobgical Monitoring <br />50.00% <br />$169,610.00 <br />$169,610.00 <br />339,220 <br />4.3 <br />2012 Post Construction <br />Monitoring <br />50.00% <br />$22,327.50 <br />' $22,327.50 <br />344,655.00 <br />Subtotal.. <br />$225,000.00 <br />$225;000:00 <br />-5450;000:00 <br />TOTAL PROJECT COSTS <br />$5,194,919.00 <br />$5,194,919.00 <br />$10,389,838.00 <br />Changes in PROJECT costs that increase- or decrease the total funding amount shall require a formal <br />amendment to the Agreement. <br />DEP Agreement No. 1FS1RI-; Attachment A, Page 1- of 3-- <br />