Laserfiche WebLink
4.2 2014 Post -Construction Biological Monitoring <br />Permit required sea turtle monitoring included pre -nesting nighttime lighting evaluations, escarpment <br />monitoring, in -water turtle monitoring, post -construction sea turtle monitoring and crawl documentation, <br />data management, Quality Assurance, nest marking, summary report and preparation of permit required <br />spreadsheet. The post construction hardbottom monitoring efforts included transect monitoring surveys of <br />23 previously established permanent cross -shore transects from R20 through R65. The field surveys also <br />consisted of the mapping of nearshore edge of hardbottom along the Length of the project. Hardbottom <br />monitoring also included a post -construction UMAM analysis of hardbottom impacts. (EAI WO's 3&4). <br />Deliverable A: 2014 Biological monitoring including sea turtle and hardbottom reporting, as required by <br />JCP permit number 0285993 -001 -JC. <br />Total Cost $339,220 (DEP cost $169,610). <br />Due Date: January 31, 2016. <br />4.3 2012 Post -Construction Physical Monitoring <br />Permit required physical monitoring was conducted in accordance with the terms and conditions of DEP <br />permit number 0285993 -001 -JC. The post construction physical monitoring efforts included data acquisition <br />and quality control, survey data analysis and the preparation of a physical monitoring report. <br />(Coastal Tech WO 11 — Task 5) (Note: The total cost of task was $62,517. The state appropriation is <br />insufficient to allow for full reimbursement of the task.) <br />Deliverable A: 2012 Post -Construction Physical Monitoring Report (Phase 1 Year 2; Phase 2 Year 1). <br />Total Cost: $44,655 (DEP cost $22,327.50). <br />Due Date: January 31, 2016. <br />NOTE: The deliverable due dates established in this Grant Work Plan indicate the time by which a <br />deliverable is received and approved for cost sharing. The dates do not necessarily correspond with permit <br />required due dates. The Local Sponsor must meet the terms of the permit for compliance. <br />All Tasks are Contractual Services. <br />DEP Agreement No. 151R1, Attachment A; Page 3 of 3 <br />