My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-070
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:48:50 AM
Creation date
4/28/2016 12:40:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/07/2015
Control Number
2015-070
Agenda Item Number
8.J.
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.3
Well Rehabilitation Construction of Well #7
Area
South Oslo Rd. Water Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Work Order Number 3 <br />Indian River County Department of Utility Services <br />South Oslo Rd Water Plant <br />Floridan Well Rehabilitation & Construction of Well #7 <br />PROJECT UNDERSTANDING <br />Indian River County Utilities (IRCU) owns and operates six (6) Floridan supply <br />wells which are the raw water supply and source water for the South Oslo Rd water <br />treatment facility. These wells are the lifeblood of the treatment facilities and <br />maintaining efficient operation of these wellfields is critical to the sustainability of <br />the water system. <br />An evaluation of the wellfield performance was conducted in November 2013 that <br />determined rehabilitation of several wells is necessary to restore capacity and <br />reliability to the water treatment plant. In addition, the planned and permitted well <br />#7 will be constructed concurrently with the rehabilitation work in order to provide <br />long term sustainability of the raw water supply to the South plant. <br />The project will consist of the following key improvements: <br />• Well rehabilitation of four (4) wells (#3, 4, 5, 6) <br />• Well #7 installation including drilling and wellhead <br />• Raw watermain construction to connect well #7 to plant raw water system <br />• SCADA system improvements to include well #7 and fiber optic <br />communication with wells (provided under separate project) <br />The following scope consists of design, bidding, construction and testing phase <br />services for rehabilitation of four (4) Floridan aquifer supply wells and well #7 at the <br />South Oslo Road Water Treatment plant. <br />SCOPE OF WORK <br />TASK 1- REVIEW WELL #7 DOCUMENTS <br />Consultant will review design drawings and specifications for well #7 drilling, <br />wellhead, and raw watermain prepared by CDM Smith, Inc. Consultant will <br />prepare a list of suggested design adjustments for the design engineer. Consultant <br />K:\WPB_Civil\044572029 - Well 7 Construction\Scope\1RCU Floridan Well Rehab Scope - IRCU rev4 wo FO.docx Page I of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.