My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-070
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:48:50 AM
Creation date
4/28/2016 12:40:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/07/2015
Control Number
2015-070
Agenda Item Number
8.J.
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.3
Well Rehabilitation Construction of Well #7
Area
South Oslo Rd. Water Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will also prepare a list of adjustments that can be considered during bidding phase <br />for inclusion into the bid documents in each of the bidding phases listed herein. <br />Consultant will prepare a plan to allow for formation water disposal from well #7 <br />and the four rehabilitated wells without impact to the existing raw watermain <br />system. <br />Consultant will develop an approach to bidding multiple contracts. The contracts <br />in general, will consist of: <br />• Drilling of well #7 and Well Rehabilitation <br />• Raw watermain and fiber optic (FO) installation <br />• Wellhead improvements (#7) <br />TASK 2 - PREPARATION OF DESIGN DOCUMENTS - WELL <br />REHABILITATION AND FIBER OPTIC COMMUNICATIONS <br />Consultant will prepare a rehabilitation program and prepare technical specifications <br />for the rehabilitation of four (4) Floridan aquifer production wells located in the <br />South -Oslo Road Wellfield. This task will consist of preparation of technical <br />specifications to obtain bids from State of Florida certified water well contractors. <br />Consultant will design a fiber optic route from well #7 to well #6, including <br />connection points for future wells. Junction boxes for future connections will be <br />designed for the remaining wells #1, #2, #3, #4, and #5. Connection to these wells <br />is not included in this design. <br />Consultant will design modifications to the existing wells #6 and #7 radio telemetry <br />units (RTU) to include fiber optic connectivity using Ethernet communication. <br />Remote PLC's will be designed at each of these wells to allow communication via <br />Ethernet over FO. A project to connect all of the remaining fiber optic connections <br />will be provided separately. <br />Consultant will incorporate well #7 specifications provided by others along with <br />fiber optic communication for wells #7 and #6. <br />Consultant will design well panel PLC hardware at well #7and #6 and interfaces <br />with existing system. <br />K:\WPB_Civil\044572029 - Well 7 Construction\Scope\IRCU Floridan Well Rehab Scope - IRCU rev4 wo FO.docx Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.