My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-070
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:48:50 AM
Creation date
4/28/2016 12:40:52 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1 Review Well #7 Docs <br />Task 2 Prepare Rehab Documents <br />And Design Fiber optic <br />Task 3 Bidding Phase <br />Task 4 Construction Phase (Rehab & <br />Well #7) <br />2 weeks from Notice to Proceed (NTP) <br />4 - 6 weeks after Task 1 <br />6 - 8 week after documents prepared <br />6 - 8 months after Notice of Award to <br />Contractor <br />FEE SCHEDULE <br />We will provide these services in accordance with our Extension and Amendment of <br />the Continuing Services Contract Agreement for Professional Services with Kimley-Horn <br />and Associates dated November 4th, 2014. <br />The Consultant will provide professional services for Task 1 through Task 4 on a <br />lump sum fee basis of $189,625.00 as follows: <br />Task No. <br />Task <br />Capital <br />Project <br />Fee <br />R&R <br />Fee <br />TASK 1 <br />REVIEW WELL #7 DOCUMENTS <br />$ 16,725 <br />$0 <br />TASK 2 <br />PREPARATION OF DESIGN <br />DOCUMENTS <br />$ 0 <br />$ 26,600 <br />TASK 3 <br />BIDDING PHASE <br />$ 10,000 <br />$ 5,000 <br />TASK 4 <br />CONSTRUCTION PHASE <br />OBSERVATIONS - Well #7 and Rehab. <br />Raw Watermain OBSERVATIONS <br />$ 60,268 <br />$ 15,400 <br />$ 55,632 <br />$0 <br />TOTAL <br />$102,393 <br />$ 87,232 <br />PROJECT TOTAL $189,625 <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, but <br />may be required depending on circumstances that may arise during the execution <br />of this project. Additional services include, but may not be limited to the following: <br />• Mechanical Design of pumps or wellheads <br />• Preparation of well #7 specifications and design documents <br />o Preparation of wellfield operating plans <br />o Permitting support other than FDEP certification of completion <br />K:\WPB Civil\044572029 - Well 7 Construction\ScopeURCU Floridan Well Rehab Scope - IRCU rev4 wo FO.docx Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.