My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-070
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:48:50 AM
Creation date
4/28/2016 12:40:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/07/2015
Control Number
2015-070
Agenda Item Number
8.J.
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.3
Well Rehabilitation Construction of Well #7
Area
South Oslo Rd. Water Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will prepare and submit a FDEP certification of construction completion <br />and request for clearance to place well #7 into operation (FDEP Form 62-555.900(9)). <br />Record drawing information will be provided by the contractors and included with <br />the certification package. <br />Raw Watermain <br />Consultant will provide limited construction coordination services for the <br />construction of the raw watermain from well 7 to the existing well #6, including <br />shop drawing review and answering questions. It is understood that Indian River <br />County inspectors will provide observation services for the construction of this raw <br />watermain. <br />Shop drawing submittal will be reviewed for conformance with the intent of the <br />contract documents. Shop drawing will be submitted directly to the Consultant. <br />The Consultant will review the submittal and return copies to the contractor and <br />Indian River County Utilities. <br />The Consultant will attend one (1) project status meeting for coordination and <br />status updates of the project with the Contractor and Owner. The Consultant may <br />recommend Change Orders to Indian River County, and will review and make <br />recommendations related to Change Orders submitted or proposed by the <br />Contractor. <br />Consultant will witness final pressure testing of raw watermain. Total observation <br />time is anticipated to be approximately 8 -hours. <br />The Consultant will prepare record drawings of the project using -information <br />provided by the contractor. An electronic copy in AutoCAD format on a CD-ROM, <br />and two sets of prints will be delivered to Indian River County Utilities upon <br />completion of this project. <br />Consultant will prepare and submit a FDEP certification of construction completion <br />and request for clearance to place the raw watermain into operation (FDEP Form <br />62-555.900(9)). Record drawing information will be provided by the contractors <br />and included with the certification package. <br />SCIIEDULE <br />In general, the following schedule is anticipated and consultant will work <br />expeditiously to meet it: <br />K:\WPB_Civil\044572029 - Well 7 Construction\Scope\IRCU Floridan Well Rehab Scope - IRCU rev4 wo FO.docx Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.