Laserfiche WebLink
• Based on information obtained through the above listed tasks, CAI will prepare and submit <br />to COUNTY engineering staff 30% Design Development Plans to include plan views, <br />striping and geometry. <br />• CAI will prepare and submit to COUNTY engineering staff a preliminary opinion of <br />probable construction costs. <br />• CAI will attend a Utility Coordination Meeting to be coordinated by the COUNTY. <br />Fees for Part 1 services are .$19,100.00 <br />Part 2. 60% Design Development: <br />• CAI will meet with COUNTY engineering staff as needed to resolve design issues. <br />• CAI will prepare written response to COUNTY engineering staff review comments on 30% <br />plans. <br />• CAI will modify 30% Design Development Plans per comments. <br />• CAI will coordinate geotechnical testing to be performed by others. <br />• CAI will design and prepare drawings for grading, plateau intersections at 41St Street <br />intersections with Ole Dixie and US1, profiles, drainage modifications, striping & signage, <br />maintenance of traffic, and also details and specifications. <br />• CAI will identify adjustment requirements for signals at the intersection of 41St Street and <br />US1. CAI will coordinate with sub -consultant (McMahon Associates, Inc.) for design of <br />signal modifications. <br />• CAI will prepare and submit permit application(s) to FDOT. <br />• CAI will prepare and submit drawings requested by FECRR. <br />• CAI will assist the COUNTY with coordination of utility adjustments. <br />• CAI will update the opinion of probable construction costs. <br />• CAI will submit to COUNTY engineering staff 60% Design Development Plans for review <br />and comment. <br />Fees for Part 2 services are .$31,950.00 <br />Part 3. 90% Design Development: <br />• CAI will meet with COUNTY engineering staff as needed to resolve design and permitting <br />issues. <br />• CAI will prepare written response to COUNTY engineering staff review comments on 60% <br />plans. <br />• CAI will address requests for additional information from FDOT and FECRR. <br />• CAI will modify 60% Design Development Plans per comments. <br />• CAI will prepare additional plan sheets for Horizontal/Vertical Control Plan, Summary of <br />Drainage Structures and Summary of Quantities. <br />• CAI will attend a Utility Coordination Meeting to be coordinated by the COUNTY. <br />• CAI will submit to COUNTY engineering staff 90% Design Development Plans for review <br />and comment. <br />Fees for Part 3 services are .$14,485.00 <br />Senv� Florida <br />eiL I Since 191 i <br />N:\PSW\P\14-84E IRC 41st St\Proposal 3-11-2015.doc Page 2 of 5 <br />