My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-071
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:54:04 AM
Creation date
4/28/2016 1:39:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/14/2015
Control Number
2015-071
Agenda Item Number
8.E.
Entity Name
Carter Associates
Subject
41st Street and US 1 Intersection Improvements
Work Order No.1
Area
41st, St. and Old Dixie
Project Number
1359
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 4. 100% Construction Plans: <br />• CAI will meet with COUNTY engineering staff as needed to resolve any outstanding issues. <br />• CAI will prepare written response to COUNTY engineering staff review comments on 90% <br />plans. <br />• CAI will modify 90% Design Development Plans per comments. <br />• CAI will assist the COUNTY with coordination of utility adjustments. <br />• CAI will finalize construction documents. <br />• CAI will submit to COUNTY engineering staff 100% Construction Drawings and Technical <br />Specifications. <br />Fees for Part 4 services are .$5,720.00 <br />Assumptions: <br />In developing this proposal, CAI represents to the COUNTY that the following assumptions have <br />been made and that deviation from these assumptions may require additional services and <br />expenditures by CAI that will require additional compensation from the COUNTY: <br />1. Design will be based on the Topographic and Right -Of -Way Route Survey of 41st <br />Street/South Gifford Road, Indian River County Project No. 1359, dated April 23, 2014, <br />prepared by CAI. <br />2. Permit application fees are not included. The COUNTY will be responsible for paying <br />permit application fees. <br />3. Geotechnical soil testing is not included and is anticipated to be necessary. CAI will <br />coordinate with the COUNTY's Geotechnical Consultant to obtain soil borings when the <br />scope of geotechnical investigation has been determined. <br />4. CAI personnel have access to all project improvement areas for the purpose of gathering <br />relevant information. <br />5. It is anticipated that additional field survey may be required to facilitate design. Additional <br />field survey is not included in this scope but can be provided by CAI through a separate <br />agreement. Such additional survey could include but not be limited to verification of <br />horizontal and vertical locations of existing buried utilities. <br />6. Pot holes may be required to obtain vertical and horizontal information on existing utilities. <br />Digging of pot holes is not included in this scope of work. <br />7. Design and/or permitting of adjustments to existing water main, sanitary sewer or other <br />utilities that are in conflict with proposed paving and drainage improvements are not <br />included. Coordination with utility providers to address necessary utility adjustments is <br />included. Design and permitting of water and wastewater utility adjustments can be provided <br />by CAI as an additional service. <br />Serving Florida <br />i [�I Since 1911 <br />N:\PSW\P\14-84E IRC 41st St\Proposal 3-11-2015.doc Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.