Laserfiche WebLink
5.14 <br />Add approximately 11 linear feet of guardrail at the South Relief Canal site. <br />Reason Design modification to comply with field conditions. <br />$251.90 <br />0.0 <br />5.15 <br />At the South Relief Canal site, construct approximately 171 square yards of 8" <br />thick reinforced concrete drive/work slab per the 2-23-2015 revision on Sheet <br />P1AA, including testing services for concrete, subgrade, and base. Reason To <br />provide stronger and firmer work/driving surface. <br />$20,966.00 <br />0.0 <br />5.16 <br />Increase the number of landscape watering events by 24 and increase the number <br />of exotic elimination events by 2. The landscape watering events will be billed on <br />a per each basis at $412.50/event and the exotic elimination events will be billed <br />on a per each basis at $1,375 per event. Reason. Construction of the project is <br />taking longer than anticipated when the landscaping services were added to the <br />contract, thus requiring additional watering and exotic control events. <br />$12,650.00 <br />0.0 <br />5.17 <br />Modify steps to control building per County Building Department. Reason. The <br />work is necessary to meet Building Code compliance. <br />$5,418.60 <br />0.0 <br />5.18 <br />Delete Bid Item No. 3.70 in its entirety <br />($2,535.00) <br />0.0 <br />5.19 <br />Remove and dispose of approximately 20.4 square yards of deteriorated existing <br />asphalt driveway and base at the South Relief Canal site. Reason. Part of the <br />existing asphalt driveway to the site from 27th Avenue is buckling and failing. It <br />will be removed and replaced with a concrete driveway (included in Item 5.15) <br />$578.89 <br />0.0 <br />5.20 <br />Insurance adjustment due to increase in contract price (1%) <br />$688.56 <br />5.21 <br />Bond increase due to increase in contract price ($11.11 per one thousand) <br />$766.59 <br />TOTALS <br />$70,310.93 <br />0.0 <br />CHANGE IN CONTRACT PRICE <br />Description <br />Amount <br />Original Contract Price <br />$5,856,660.20 <br />Net increase/decrease from previous Change Orders <br />$284,813.80 <br />Contract Price prior to this Change Order <br />$6,141,474.00 <br />Net increase/decrease of this Change Order <br />$70,310.93 <br />Contract Price with all approved Change Orders <br />$6,211,784.93 <br />CHANGE IN CONTRACT TIME (Calendar Days) <br />Description <br />Amount <br />Original Contract Time for Final Completion <br />365.0 <br />Net increase/decrease from previous Change Orders <br />103.0 <br />Contract Time for Final Completion prior to this Change Order <br />468.0 <br />Net increase/decrease of this Change Order to Final Completion <br />0.0 <br />Contract Time for Final Completion with all approved Change Orders <br />468.0 <br />ACCEPTED: <br />CONTRACTOR (Signature) <br />Close Construction, LLC <br />7{1o1Y1as 0.0ose mri" e <br />(Name and Title) <br />Date: Oil Og. t I.3� <br />Attest Jeffrey R.1th, Clerk of <br />Circuit Court mptroi <br />puty : rk <br />eMbQr- <br />RECOMMENDED• wei <br />By ` <br />EN EER (SignatMcCull <br />P.E., Indian River County Stormwate <br />Engineering Division <br />Date 4- /0-2b/5 <br />APPRO D: <br />O ER: Indian River County Board of <br />County Commissioners <br />Chairman <br />Date: Anri 1 71 . 7f11 s <br />