My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2016
CBCC
>
Meetings
>
2010's
>
2016
>
03/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 1:29:27 PM
Creation date
5/3/2016 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/22/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
including coordination with agencies. Okeechobee County; and FPL, and attendance at the June 1, <br /> 2015 public "open house" information session held at the Richardson Center. At this point in time, <br /> the County needs to file an "agency report" with FDEP to provide comments and recommended <br /> certification conditions that are within the County's scope of jurisdiction. In this case, the agency <br /> report must be filed with FDEP by April 6, 2016. A certification process schedule for the subject <br /> OCEC Unit 1 project is attached (see attachment #2). <br /> On March 1, 2016, the Board of County Commissioners reviewed an initial working draft agency <br /> report prepared by County staff, heard from FPL representatives and members of the public, and <br /> provided staff with comments. Staff from SJRWMD were also in attendance at the March 1 <br /> meeting. Since that time, staff continued coordinating with agencies (particularly the SJRWMD), <br /> Okeechobee County, and FPL, and prepared a revised agency report (proposed agency report). The <br /> Board is now to consider the proposed agency report (see attachment 48), direct staff to make any <br /> necessary changes to the report, and authorize the Community Development Director to submit the <br /> agency report to FDEP. <br /> ANALYSIS <br /> Last spring, FPL representatives contacted County staff about the proposed project and site <br /> certification process. Since that time,County staff has coordinated with FPL,FDEP,SJRWMD,the <br /> IRC Sheriffs Office,and Okeechobee County representatives. The BCC has been copied on County <br /> staff comments and determinations made during the review process. Early on, prior to FPL's <br /> September 2015 filing of the site certification application (SCA), and during the formal review <br /> process County staff identified 4 potential project impacts on Indian River County that are <br /> specifically addressed in County codes and the comprehensive plan. Those impacts included Traffic, <br /> Impact Fees, Emergency Services, and Water Supply. Staff s formal review comments and FPL's <br /> responses are attached as a reference (see attachment 93). Each of the identified impact issues is <br /> discussed below. <br /> • Traffic <br /> The project's traffic engineer coordinated with County staff and submitted a traffic study for the <br /> project. That study evaluated traffic conditions during project construction(±18-24 months,±650 <br /> workers)and plant operation and was reviewed by County Traffic Engineering. Although the study <br /> showed conditions that did not trip any FDOT turn lane thresholds, the study did show conditions <br /> that tripped the County's more stringent turn lane thresholds codified in LDR section 952.12. <br /> Specifically, the study showed a need for an eastbound right turn lane at the project access road's <br /> connection to SR60. In order to comply with County turn lane standards,FPL agreed to construct as <br /> part of the project an eastbound right turn lane at the project's SR60 entrance, in accordance with <br /> applicable FDOT and County design standards. The proposed agency report includes a <br /> recommended turn lane condition,and FPL has agreed to that condition(see attachment#8,page 2). <br /> FACommunity Development\Users\CDADMIN\AGENDA\Current Year\2016\Consideration of Agency Report ror FPL's PRoposed 2 <br /> Okeechobee Clean Energy Center 032216 BCC.docx <br /> 173 <br />
The URL can be used to link to this page
Your browser does not support the video tag.