My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2016
CBCC
>
Meetings
>
2010's
>
2016
>
03/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 1:29:27 PM
Creation date
5/3/2016 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/22/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 2015 1-1 14-14979 <br /> 1.0 INTRODUCTION AND GENERAL INFORMATION <br /> This chapter of the Site Certification Application (SCA) provides background on the Site and the <br /> applicant, Florida Power&Light Company(FPL or the Company). Chapter 1 also addresses specific <br /> applicant information requirements, provides an overview of the Okeechobee Clean Energy Center <br /> Project (OCEC or Project) for which FPL seeks certification, references the state determination of <br /> need and separate federal licensing projects, and provides a summary of FPL's public outreach <br /> program for the Project. <br /> 1.1 Introduction <br /> FPL proposes to construct a new combined cycle natural gas fired generating unit (OCEC Unit 1), <br /> providing approximately 1,600 megawatts(MW)nominal of electric generation in 2019. The Project <br /> for which FPL is seeking certification includes the construction and operation of OCEC Unit 1, the <br /> Site to be certified (the "Site"), as well as associated linear facilities. The Site is comprised of <br /> approximately 2,341 acres of FPL's 2,842 acre Property located adjacent to the existing 500-kV <br /> transmission system in northeastern Okeechobee County (Figure 1.1-i). The Site includes an area <br /> designated for potential future development of approximately 200 MW of photovoltaic (PV) solar <br /> generation that will bring the net ultimate Site capacity to 1,800 MW nommal. A conceptual <br /> illustration of OCEC Unit 1 is presented in Figure 1.1-2. <br /> FPL purchased the Property in unincorporated Okeechobee County in 2011. The Site is ideally <br /> located in an area adjacent to both natural gas and electrical transmission through lateral connections <br /> or existing structures. The Site also has groundwater available to support plant operations including <br /> process water, steam cycle makeup, cooling water makeup, and miscellaneous plant uses. A <br /> boundary survey that contains the Site legal description on FPL Property is included in Attachment C <br /> of Appendix 10.4. <br /> FPL is seeking approval of the OCEC Project under the Florida Electrical Power Plant Siting Act <br /> (PPSA), Chapter 403, Part 11, Florida Statutes (F.S.). The PPSA provides a centralized review and <br /> licensing process for new steam or solar electrical generating facilities in Florida of 75 MW or <br /> greater,balancing"the increasing demand for electrical power with the broad interests of the public." <br /> The Florida Public Service Commission(FPSC) is the sole forum for the determination of need for a <br /> proposed facility (Section 403.519, F.S.). FPL is currently seeking a determination of need for the <br /> OCEC Unit 1. The Florida Department of Environmental Protection (FDEP) acts as the coordinator <br /> for the Site Certification process, with input from various state, regional, and local agencies, along <br /> with interested citizens. Ultimate disposition of the SCA is determined by the Governor and Cabinet <br /> Attachment 1 b <br /> 179 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.