My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2016
CBCC
>
Meetings
>
2010's
>
2016
>
03/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 1:29:27 PM
Creation date
5/3/2016 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/22/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 2015 1-2 14-14979 <br /> sitting as the Siting Board, or by the Secretary of the FDEP. This SCA is being filed with FDEP <br /> pursuant to Section 403.5064, F.S., and Chapter 62-17, Florida Administrative Code (F.A.C.). The <br /> SCA describes the Project and addresses its environmental and socioeconomic aspects by presenting <br /> information on the existing natural and human environment, the facilities to be constructed and <br /> operated, and the impacts of the Project on those environments. The format and content of this SCA <br /> follow FDEP's draft "Application Instruction Guide: Electrical Power Plant Sites and Associated <br /> Facilities Electrical Transmission Lines" dated September 1, 2009. FPL is concurrently filing with <br /> FDEP an Air Construction/Prevention of Significant Deterioration (PSD) Permit Application. A U.S. <br /> Army Corps of Engineers (USAGE) Section 404 application is currently under review. In March <br /> 2015, the FDEP issued an Underground Injection Control (UIC) Class V Permit (Permit No. <br /> 0330373-001-UC/lEX) for an exploratory well and a dual zone monitoring well. FPL will obtain a <br /> UIC Class I construction and operational testing permit upon completion of the exploratory well and <br /> dual zone monitoring well and submission of the injection well completion report to DEP. The UIC <br /> Class I permit will authorize conversion of the exploratory well to an injection well and construction <br /> of a second injection well. FPL requests that the certification for the Project include one variance <br /> pursuant to Rule 62-17.051(3)(a),F.A.C.: <br /> • SJRWMD ERP Applicant's Handbook Vol. IL Section 8.8 (Pond Depth) and 8.9 (Pond <br /> Configuration): Modification to the applicable design parameters pertaining to the stormwater <br /> pond configuration and depth,as described below in SCA Section 4.8.1. <br /> 1.2 The Applicant <br /> FPL, a subsidiary of NextEra Energy, Inc., is the largest electric utility in Florida with a service area <br /> of approximately 27,650 square miles. FPL serves approximately 4.8 mullion customer accounts, <br /> with a service territory in all or parts of 35 Florida counties(Figure 1.2-1). <br /> FPL's existing generating resources are located at power plant sites (Figure 1.2-1) distributed <br /> geographically around its service territory, and also include partial ownership of two units located in <br /> Jacksonville, Florida,and one unit in Georgia. The total summer system firm generating capability as <br /> of December 31, 2014 was 25,072 MW, consisting of nuclear units (3,453 MW), coal units (897 <br /> MW), combined cycle units (14,817 MW), oil/gas fossil steam units (3,663 MW), combustion <br /> turbines (319 MW), and gas turbines (1,908 MW) (FPL, 2015). In addition, there are two solar PV <br /> facilities with a combined generation capacity of 35 MW and a solar thermal facility capable of <br /> producing steam that can generate 75 MW. The solar thermal facility is the world's first hybrid <br /> energy center to combine solar thermal technology with an existing combined cycle generation unit. <br /> 10,7,1 Attachment 1 b <br /> F-'L 180 <br />
The URL can be used to link to this page
Your browser does not support the video tag.