My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2016
CBCC
>
Meetings
>
2010's
>
2016
>
03/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 1:29:27 PM
Creation date
5/3/2016 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/22/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 2015 1-3 14-14979 <br /> FPL's bulk transmission system is composed of approximately 6,888 circuit miles of transmission <br /> lines. Integration of the generation, transmission, and distribution system is achieved through FPL's <br /> approximately 596 substations(FPL, 2015). <br /> FPL is a leader among the nation's electric utilities for its partnerships with customers in conservation <br /> and in energy management. <br /> The following information addresses the applicant identification requirements: <br /> Applicant's Official Name: Florida Power&Light Company(FPL) <br /> Address: 700 Universe Boulevard,Juno Beach FL 33408 <br /> Address of Official Headquarters: 700 Universe Boulevard,Juno Beach FL 33408 <br /> Business Entity(corporation, C_ oraoration <br /> partnership,co-operative): <br /> Name and Title of Chief Eric Sila,-y,President and CEO <br /> Executive Officer: <br /> Name,Address,and Phone Matthew J. RatlenberQ,Director ofEnvironmental Licensing <br /> Number of Official Environmental Services Department 700 Universe Boulevard. <br /> Representative responsible for J_ES/JB,Juno Beach,FL 3340_8 <br /> obtaining certification: Phone. (561) 691-2808 <br /> Site Location(county): Okeechobee County <br /> Nearest Incorporated Cities: City of Vero Beach 24 miles and City of Okeechobee 27 <br /> miles <br /> Latitude and Longitude: 27138'03"; 80'47'28". <br /> UTM Coordinates: Northerly 3,056.69 kilometers(km)N. <br /> Easterly 520.60 km E(Zone 17) <br /> Section,Township,Range: Portions of Sections 1211&12 Township 33 South Ran a 35: <br /> East <br /> Name Plate Generating Capacity: Site CertiTcation: Nominal 1.622-MW(net) combined c,�c1e <br /> unit and up to 200 MW ofpotential future solar for a net <br /> ultimate Site capacity of 1,822 MW nominal) <br /> The specific location information above is for the electrical generating unit. The proposed linear <br /> facilities corridor extends north from the Site approximately 1 mile to State Road (SR) 60 located in <br /> Indian River County. <br /> Attachment 1 b <br /> '" � 181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.