My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2016
CBCC
>
Meetings
>
2010's
>
2016
>
03/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 1:29:27 PM
Creation date
5/3/2016 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/22/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®RE <br /> vioalw oeaear«�xr� <br /> Updated 12/2014 <br /> Environmental Assessment <br /> Responsible Entity: Indian River County <br /> [24 CFR 58.2(a)(7)] <br /> Certifying Officer: Bob Solari, Chairman Indian River County Board of County <br /> Commissioners <br /> [24 CFR 58.2(a)(2)] <br /> Project Name: West Wabasso Phase 2 New Sewer Mains and New Sewer <br /> Hookups/Gifford Flood and Drainage. <br /> Project Location: Service area 1 general location is in the northeast section of Indian <br /> River County Oust north of Vero Beach off of Highway US 1. The boundary streets for the <br /> proposed project are in the area south of 510 between 64th Avenue and 62nd Avenue. <br /> Service area 2 general location is in the East Gifford area between 28th Avenue to the <br /> west, Old Dixie Highway to the east, 43rd Street to the north and 42nd Street to the south <br /> encompassing 42nd Place, 27th Avenue, 26th Avenue, 25th Avenue, 24th Court and 24th <br /> Avenue. <br /> Estimated total project cost: $1,297,000.00 <br /> Grant Recipient: Indian River County <br /> [24 CFR 58.2(a)(5)] <br /> Recipient Address: 180127 th Street, Vero Beach, Florida 32960 <br /> Project Representative: Ariuna Weragoda <br /> Telephone Number: (772) 226-1821 <br /> Conditions for Approval: All necessary permits and certifications will be obtained <br /> before issuing an notice to proceed, a stormwater pollution prevention plan will be <br /> developed and maintained at the site, erosion control measures are to be taken by <br /> awarded contractor according to the stormwater pollution prevention plan within the <br /> project plans along with best management practices also included within the project <br /> plans. <br /> (List all mitigation measures adopted by the responsible entity to eliminate or minimize adverse <br /> environmental impacts. These conditions must be included in project contracts and other relevant <br /> documents as requirements). [24 CFR 58.40(d),40 CFR 1505.2(c)] <br /> Page 2 of 11 15 <br /> [Previously recommended EA formats are obsolete] <br />
The URL can be used to link to this page
Your browser does not support the video tag.