My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2016
CBCC
>
Meetings
>
2010's
>
2016
>
03/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 1:29:27 PM
Creation date
5/3/2016 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/22/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DMO <br /> ►oe�vzr�sxtr <br /> CCOMON Updated 12/2014 <br /> FINDING: [58.40(g)] <br /> Finding of No Significant Impact <br /> (The project will not result in a significant impact on the quality of the human environment). <br /> Finding of Significant Impact <br /> (The project may significantly affect the quality of the human environment) <br /> 7 <br /> Preparer Signature: Date: Qzo <br /> Title and Agency: Vic President and COO, uardian CRM, Inc. <br /> RE Approving Official Signature: <br /> Title: Chairman Date: <br /> Local Government Name and Location: Indian River County, 1801 27th Street, Vero <br /> Beach, Florida 32960 <br /> Statement of Purpose and Need for the Proposal: [40 CFR 1508.9(b)] <br /> New sewer mains and lift station are needed to provide for elimination of a substandard <br /> septic systems and improve quality of life for the community by improving property values <br /> and providing access to safe sanitary sewer, a complimentary benefit will be the <br /> reconstruction of streets and paving to modern standards, further adding to the quality of <br /> life in the community. Re-graded swales and new culvert pipes will convey stormwater <br /> flows to the existing wet detention pond located south of 42nd Street to provide <br /> improvements to the flood and drainage in the area. <br /> Description of the Proposal: Include all contemplated actions, which logically are <br /> either geographically or functionally a composite part of the project, regardless of <br /> the source of funding. [24 CFR 58.32, 40 CFR 1508.25] <br /> The proposed project includes Phase II of the West Wabasso new sewer mains, 16 <br /> manholes and laterals and up to a possible 45 sewer hook-ups. A complimentary benefit <br /> will be the reconstruction of streets and paving to modern standards. The Gifford Flood <br /> and Drainage improvement project includes improving' swales and new culverts in the <br /> East Gifford area. These re-graded swales and new culvert pipes will convey stormwater <br /> flows to the existing wet detention pond located south of 42nd Street. <br /> Existing Conditions and Trends: Describe the existing conditions of the project <br /> area and its surroundings and trends likely to continue in the absence of the <br /> project. [24 CFR 58.40(a)] <br /> The project is one part of the larger West Wabasso Sewer Improvements Plan Phase 2 <br /> project. The intent of these funds are to benefit low and moderate income persons and <br /> address speck and urgent needs, in this case, health and safety due to septic tanks <br /> that are 50 years old and not current with modern standards and heavy rains will cause <br /> the septic sVstems to not work. <br /> Page 3 of 11 16 <br /> [Previously recommended EA formats are obsolete.] <br />
The URL can be used to link to this page
Your browser does not support the video tag.