My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2016
CBCC
>
Meetings
>
2010's
>
2016
>
03/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 1:29:27 PM
Creation date
5/3/2016 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/22/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEW-54',"' <br /> rLofm o�wr►naxri <br /> °XO`O'"�OPP '"'T" Updated 12/2014 <br /> STATUTORY WORKSHEET <br /> 24 CFR §58.5 .and §58.6 <br /> STATUTES, EXECUTIVE ORDERS & REGULATIONS <br /> Project Name: West Wabasso Community Sewer System Gravity Sewer Plan Phase 2 <br /> and Gifford Flood and Drainage Project Project Contract Number: 16DB-OK-10-40-01- <br /> N05 <br /> Project Description: Include all contemplated actions that logically are either geographically or <br /> functionally part of the project: Homes in the West Wabasso Phase 2 service area currently <br /> are hooked to septic tanks. Health and safety conditions will improve with the provision <br /> of the CDBG funded public sewer lines. The new sewer lines in West Wabasso will allow <br /> substandard septic systems to be eliminated and improve the quality of life for that <br /> community by improving property values and providing access to safe and sanitary <br /> sewer service. A complimentary benefit will be the reconstruction of streets and paving <br /> to modern standards, further adding to quality of life in the community. The project <br /> includes new sewer lines, 16 manholes and laterals. A new lift station will also be <br /> provided south of County Road 510. Health and safety conditions will improve with the <br /> provision of sewer hookups, up to 45 hookups are possible. The Gifford Flood and <br /> Drainage Service area include improving swales and constructing new culverts in the <br /> East Gifford area. Re=qraded swales and new culvert pipes will convey stormwater <br /> flows to the existing retention pond located south of 42nd Street. <br /> DIRECTIONS: Write "A"in the Status Column when the proposal, by its scope and nature, does <br /> not affect the resources under consideration; or write `B" if the project triggers formal compliance <br /> consultation procedures with the oversight agency, or requires mitigation(see Statutory <br /> Worksheet Instructions). Compliance documentation must contain verifiable source documents <br /> and relevant base data. <br /> Compliance Factors: <br /> ' r <br /> STATUTES, EXECUTIVE ORDERS AND COMPLIANCE DETERMINATION <br /> REGULATIONS LISTED AT 24 CFR§58.5 A/B AND DOCUMENTATION <br /> HISTORIC PRESERVATION A The proposed project is not anticipated to have <br /> 36 CFR PART 800 an effect on historic properties. SHPO and <br /> THPO have been contacted, comments have <br /> been requested. SHPO responded with a'no <br /> effect'determination,also historic registry has <br /> been reviewed. See registry,comment letters, <br /> NEPAssist locations map. <br /> FLOODPLAIN MANAGEMENT A The project does not involve property acquisition, <br /> 24 CFR §55 & EXECUTIVE ORDER 11988 management,construction or improvements of <br /> more than four(4)residential units within a SFHA <br /> or 100—year floodplain. FEMA has been <br /> contact, requested comments, none received. <br /> See attached FEMA Firm map,comment letters. <br /> Page 4 of 11 17 <br /> [Previously recommended EA formats are obsolete.] <br />
The URL can be used to link to this page
Your browser does not support the video tag.