Laserfiche WebLink
JOSEPH W.SCHULKE.P.E. SCHULKE, BITTLE & STODDARD, L.L.C. <br /> 10DAH B.BITTLE.P.E. <br /> WILLIAM P.STODDARD.Ph.D.,P.E. CIVIL & STRUCTURAL ENGINEERING • LAND PLANNING a ENVIRONMENTAL PERMITTING <br /> March 2, 2016 <br /> Arjuna Weragoda, P.E. <br /> Capital Projects Manager <br /> Indian River County Department of Utility Services <br /> 1801 27th Street <br /> Vero Beach, FL 32960 <br /> Re: Central Wastewater Treatment Facility Bid Recommendation <br /> Dear Mr. Weragoda: <br /> Please accept this summary evaluation of the bids for the Central Wastewater Treatment Facility <br /> and recommendation to award the contract. <br /> Generally, the bids came in significantly higher than the initial estimate for the work. The initial <br /> estimate was $151,735:00; while.the lowest-adjusted (see below-explanation) base-bid for the <br /> Central Wastewater Treatment Facility (CWWTF) was $300,116.00. The initial estimate was <br /> based on the unit prices for the South Regional Wastewater Treatment Facility (SWWTF), which <br /> had a similar rehabilitation work completed in 2012/ 2013 The cost per SF of the rehabilitation <br /> work to the concrete surfaces of the headworks for the previous SWWTF project was $20.25 per <br /> sf, and the recent low bid for the CWWTP project came in at approximately $27.00 per sf or 33% <br /> higher. However, a contingency was added to the initial estimate to account for discrepancies due <br /> to inflation and other factors. Therefore, the bid price for that portion of the work for the CWWTF <br /> came in close to what was initially estimated. The discrepancy in costs is due to the replacement <br /> costs for the screw gates. The initial preliminary estimate was prepared with limited knowledge <br /> and without an evaluation by this consultant of the condition of the plant. The estimate assumed <br /> that only the two (2) screw gates leading to the two main channels of the headworks would need <br /> to be replaced. However, it was apparent during the engineering evaluation and design of the <br /> rehabilitation project that all eight (8) screw gates would have to be replaced with slide gates. <br /> Further, while there are less expensive gate options, the IRCDUS operations staff requested <br /> during the design of the project that only CoPlastix slide gates were to be specified in the bid — <br /> as these have been incorporated in other recent IRCDUS rehabilitation projects, and staff had <br /> found these to be reliable, trouble-free systems. In addition, incorporating these gates on all <br /> projects going forward .provides compatibility of materials / components_on all IRCDUS VW T <br /> facilities, so parts will be interchangeable. Unit prices between CoPlastix gates and other <br /> alternative gates differ by as much as $10;000 per gate (from $20,000 per gate for CoPlastix to <br /> $10,000 per gate for other types). The change in the gate quantity and manufacturer accounts <br /> for approximately $150,000 in additional costs (including additional costs for mobilization and <br /> bonding, which costs are dependent on the total contract amount). <br /> Below is my review of the bids for the Central Wastewater Treatment Facility(CWWTF). It should <br /> be noted that two bidders submitted exceptions to the plan specifications and submitted bids with <br /> alternate materials; however, only one of these two bidders - Florida Design Drilling Corp. - <br /> submitted a relatively competitive bid. Also, the bid form included two add alternates for minor <br /> surface repairs and re-painting of the exterior of the structure. IRC will have to decide if it wants <br /> to include these additional costs for this work, which was not included in the original scope or <br /> 1717 INDIAN RIVER BLVD.,SUITE 201.VERO BEACH.FLORIDA 32960 <br /> TEL 772/770-9622 Fax 772/770-9496 EMAIL info@sbsengineers.com <br /> Certification of Authorization No:00008668 <br /> 60 <br />