Laserfiche WebLink
CARTER ASSOCIATES, INC. <br /> CONSULTING ENGINEERS AND LAND SURVEYORS <br /> 1708 215t STREET.-VERO BEACII,FLORIDA 32960.3472•772-562.4191•772.562-7180(FAX) <br /> JOHN H.BLUM.P.E.,PRINCIPAL FRANK S.CUCCORESE,P.S.M. <br /> DAVID E.LUETAJE,P.S.M.,PRINCIPAL CLINTON J.RAHJES,P.E. <br /> GEORGE A:SIMONS,P.E.,PRINCIPAL STEVE D.SNOBERGER.P.F_ <br /> PATRICK S.WALTHER,P.L.PRINCIPAL <br /> MARVIN E.CARTER;P.S.M.,Consultant to the Firm <br /> DEAN R LUETHJE.P.E...i�a nci Consultant to the Finn <br /> February 4,2016 <br /> Mr. Michael Nixon,P.E. <br /> Roadway Production Manager <br /> Engineering Department <br /> Indian River County <br /> 1801 27`"Stteet,Bldg. A <br /> Vero Beach,FL 32960 <br /> Re: Indian River County Project No. 1359 <br /> 41St Street Intersection Improvements @ Hwy US 1 and Old Dixie Hwy' <br /> Arneiidment No. 1 to Professional Engineering Services Agreement-Work Order No. 1 <br /> Dear Mike: <br /> We are pleased to present this proposed Amendment for additional professional engineering <br /> services relative resolving conflicts with and designing adjustments to existing IRC utilities. In <br /> general, there ate two water main conflicts with proposed storm water curb inlets=along Old Dixie <br /> Highway which will require adjustments to the water main- two water main-conflicts with the <br /> proposed storm piping which will require adjustments to -the -storm piping; two water <br /> meter/backflow preventer,relocation s, one fire hydrant relocation; and top Adjustmenis;forsanitary <br /> sewer manholes and valves. All provisions of the original Executed Work'Oider:No. 1- <br /> Erigineering-Dated 4/14/2015 shall remain in full force and effect. The following describes our scope of <br /> work and terms of agreement between Carter Associates,Inc.(CAI)and Indian River County(COUNTY): j <br /> Task 1 Incidentals & Coordination with County Staff <br /> CAI will meet with engineering staff to discuss the known conflicts, the resolution of such conflicts <br /> and to coordinate an acceptable plan preparation approach and method of.incorporating the new <br /> conflict plans into the roadway bid/construction plan set(The meetings have.already occurred). CAI ;. <br /> will-prepare a preliminary opinion of construction costs for the County Utility-Depaitinent's use in <br /> budgeting the work. CAI will attend progress meetings with county staff as the bid/construction <br /> plan set is revised. CAI will coordinate with Utilities staff and submit utility design drawings as <br /> progress and final plans are progressing. <br /> Task1 fees are............................................................:.....................:.......:.$2,320.00 <br /> A If Serving Florida <br /> YL-WA Since 1911 <br /> NAPSW014-8413IRC41st SAProposals\A nendment 1 Proposal2-4-2016.doc Pagel of3 <br />