Laserfiche WebLink
Task 2 Design <br /> CAI will prepare plan and profile drawings of each of two water main adjustments at conflicts with <br /> storm water curb inlets. CAI will prepare plan sheets for two water meter/backflow preventer <br /> relocations; one fire hydrant relocation; and top adjustments for sanitary sewer manholes and <br /> valves. CAI will prepare detail sheets, FDOT quantity take-off, general notes sheet and technical <br /> specifications for the proposed utility adjustments. Separate design drawing ,sheets will be <br /> generated to be included in the bid/construction plan set that clearly identify all utility adjustments. <br /> The storm sewer piping design will be modified in the roadway design plans to lower the storm <br /> piping to avoid conflicts at the two locations in Old Dixie HWY. <br /> Task2 fees are...........................................................................................$8,180.00 <br /> Task 3 Permittins <br /> CAI will utilize the permitting exemption found in paragraph 62-555.520(l)(c)3. of the Florida <br /> Administrative Code for relief from a Florida Department of Envirorunental Protection (FDEP) <br /> permit. CAI will submit plans to the Department to obtain the exemption. <br /> Task3 fees are..............................................................................................$560.00 <br /> Total....................................................................................................$11,060.00 <br /> Reimbursables Estimated at........................ ............... ...............$200.00 <br /> ........... ........... <br /> GrandTotal .. ......................................................................... . ..........$11;260.00 <br /> Assumptions <br /> In developing this proposal, CAI represents to the COUNTY that the following assumptions have <br /> been made and that deviation from these assumptions may require additional.expenditures on behalf <br /> of the COUNTY to CAI. <br /> 1. CAI assumes no county Right-of-Way or Utility permit will be required for this project. <br /> 2. CAI assumes the project will not require an FDEP permit. <br /> 3. CAI assumes installation of isolation valves and details of such will not be required for <br /> water main adjustments. It is assumed that the County Utilities will isolate the segments to <br /> be adjusted by turning existing valves off. County Utilities will be responsible for turning <br /> the valves off and notifying customers of all temporary outages. <br /> 4. No permitting, application, impact and/or testing fees are included and will be paid for by <br /> the COUNTY or Contractor(as applicable)separately. <br /> —_A_I Sewing Florida <br /> [WSuice lall <br /> N:\PS\V\P\14-84E IRC 41st St\Proposals\Amendment 1 Proposal 2-4-2016.doc Page 2 of 3 <br />