My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/30/1986
CBCC
>
Meetings
>
1980's
>
1986
>
9/30/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:20 AM
Creation date
6/12/2015 1:05:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/30/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />SEP 3 0 1986 <br />4 <br />BOOK 6� <br />.z <br />ON MOTION by Commissioner Lyons, SECONDED by Commis- <br />sioner Bowman, the Board unanimously (4-0) authorized <br />installation of a grounding system for the radio tower <br />at Kiwanis-Hobart Park, cost of the project not to ex- <br />ceed $5,000; funding from the Radio Tower Receipts Fund. <br />B. Guard Tower, County Jail, Phase I <br />The Board reviewed memo of General Services Director Dean <br />and proposal by Frizzell Architects: <br />TO:The Honorable Members DATE: September 15, 1986 FILE: <br />of the Board of County <br />Commissioners <br />THRU: Charles P. Balczun SUBJECT: Guard Tower <br />County Administrator Indian River County Jail <br />Phase I <br />H. T. "Sonn Dean <br />FROM: Director REFERENCES: <br />General Services <br />At the time of design for Phase I of the jail project, there was not <br />any 'thought given to a need for a guard tower. Since then, the jail <br />Administrator and staff determined it is absolutely necessary to have <br />a tower constructed and strategically located outside the fenced area <br />adjacent to the recreation yard. <br />The general contractor has advised this writer that any change order <br />ifi his contract would necessitate an extension of time plus the cost <br />of construction. Since the general contract is close to expiration, <br />" and the pressure is on for completion, it is felt that an alternate <br />method of construction be recommended. <br />I have personally talked with W. R. Frizzell's project personnel, and <br />they have agreed to let Mr. Walt Swentzell, site representative, <br />supervise this project without additional cost. <br />Osceola County jail people were contacted in reference to a <br />prefabricated tower they had installed at their new jail site and the <br />cost exceeded $23,000. <br />Based on the need, and information as provided, staff recommends <br />approval of the project as submitted. Funds to construct the tower <br />will be taken from the construction contingency fund. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.