My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/30/1986
CBCC
>
Meetings
>
1980's
>
1986
>
9/30/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:20 AM
Creation date
6/12/2015 1:05:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/30/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />July 28, 1,986 <br />Mr. Sonny Dean <br />Director of General Services <br />Indian River County - <br />1840 25th Street <br />Vero Beach, Florida 32961 <br />0 <br />RE: INDIAN RIVER COUNTY JAIL - PHASE 1 <br />Jail Tower <br />Dear Sonny: <br />FRIZZELL ARCHITECTS <br />1766 <br />c <br />AUG 1936 <br />REC ES - <br />.Gerierd <br />Services <br />> �Q <br />�NlMr1l <br />Per your request we have put together a cost list for the --- <br />proposed <br />_..,.proposed guard tower with labor and materials. Proposal does not <br />include taxes, insurance or permit costs. We discussed this and <br />your thoughts at that time were that -you did not Want to include <br />these items. <br />BREAKDOWN. <br />1. Concrete, mortar, re -bar, sand, etc. <br />Rinker of Vero Beach <br />$1,051. <br />2. Masonry, flush-C.M.U. <br />ribbed C.M.U. <br />By RSH on site (materials only) <br />460. <br />3. Rough hardware - allowance <br />100. <br />4. Framing and trim lumber <br />Diamond Lumber - Vero Beach <br />9817, <br />5. Trusses - Tru -line, Ft. Pierce <br />100. <br />6. Roof, 26 ga. V -crimp <br />Atlantic Roofing, Vero Beach <br />- (includes roof installation) <br />695. <br />7. Steel stairs and angles <br />- Barry's Iron, Vero Beach <br />' (includes installation) <br />5,500. <br />-8. Chain link fence <br />30. <br />Robert Caron Construction of Vero Beach has <br />given a price for: <br />^1. Masonry labor, forms, place & finish <br />concrete, labor framing and trim <br />$3,800. <br />2. Allowance for concrete testing & soil <br />testing <br />300. <br />3. Allowance for telephone & electrical <br />conduit & box <br />500. <br />4. Allowance for painting <br />500. <br />2 S62•�b <br />16, <br />Sonny, I would like to go over this proposal <br />convenience. Please call. <br />with you at your <br />Very truly yours, <br />W. R. FRIZZELL ARCHITECTS, INC. <br />Ben <br />DiPalma <br />Project Administrator <br />W. R. Frizzell Architects, Inc. ♦ Suite 202 ♦ Royal Palm Square♦ 1400 Colonial Boulevard Fort Myers. Florida 33907-1093 (813) 939-1220 <br />E <br />BOOK � FA IL 840 <br />
The URL can be used to link to this page
Your browser does not support the video tag.