Laserfiche WebLink
OCT 2 8 1986 <br />BOOK <br />213 <br />consultant for structural <br />analysis and then realized <br />there <br />were <br />some other items that needed to be looked at in order to meet <br />required standards. <br />Commissioner Wodtke asked if the bridge will be wider and <br />possibly have some kind of a median to separate pedestrian and <br />vehicular traffic. <br />Director Davis advised that it will. It also will be wider; <br />the spans will be longer; it will accommodate pedestrians better <br />than it does now and will be much safer. <br />ON MOTION by Commissioner Wodtke, SECONDED by Com- <br />missioner Pn°.., �e the Board unanimously authorized <br />the appropriation of an additional $2,000 from the <br />Road and Bridge Dept. account 111-214-541 to complete <br />the design of the replacement bridge over the Main <br />Relief Canal at the Vero Beach Country Club. <br />M. Final Plat Approval - Wolff Road <br />The Board reviewed memo of Staff Planner Boling: <br />TO: The Honorable Members of DATE: October 17, 1986 FILE: <br />The Board of County Commissioners <br />DIVISION HEAD CONCURRENCE: <br />Robert M. Keating, P SUBJECT: FINAL PLAT FOR WOLFF ROAD <br />Planning & Deveylopm nt Director <br />THROUGH: Michael K. Miller <br />Chief, Current Development <br />FROM: Stan Boling �. REFERENCES: Wolff <br />Staff Planner STAN4 <br />It is requested that the data herein presented be given formal <br />consideration by the Board of County Commissioners at their <br />regular meeting of October 28, 1986. <br />DESCRIPTION AND LOCATION: <br />At their regular meeting of September 11, 1986 the Planning and <br />Zoning Commission granted conditional site plan approval to <br />Advance Pool Designs. A condition of approval stipulated that a <br />final plat must be filed, prior to release of site plans, to <br />establish the required amount of dedicated road frontage for the <br />site. At their regular meeting of September 25, 1986, the <br />14 <br />