My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/18/1986
CBCC
>
Meetings
>
1980's
>
1986
>
11/18/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:20 AM
Creation date
6/12/2015 1:16:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/18/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Bowman, the Board unanimously awarded the <br />contract to Coastline Utilities, Inc., in the amount <br />of $73,122 for the sewer project at 12th Street and - <br />Commerce Avenue as recommended by staff. <br />12TH ST. WATER DISTRIBUTION IMPROVEMENTS FROM OLD DIXIE TO 6TH <br />AVE. & COMMERCE AVE. FROM 12TH ST. TO 10TH ST. <br />The Board reviewed the following memo: <br />TO: BOARD OF COUNTY COMMISSIONERS DATE: November 4, 1986 <br />THRU: CHARLES BALCZZ�ADMIINNIS O <br />VIA: TERRANCE G. Wofgi OF UTILITY SERVICES <br />FROM: JEFFREY A. BOONE, ENGINEERING OPERATIONS MANAGER <br />.SUBJECT: 12TH STREET WATER DISTRIBUTION IMPROVEMENTS <br />12TH STREET FROM OLD DIXIE HIGHWAY TO 6TH AVENUE and <br />COMMERCE AVENUE FROM 12TH STREET TO 10TH STREET <br />INDIAN RIVER COUNTY UTILITIES DIVISION PROJECT #UW86-16-DS- <br />On June 25, 1986, the Board of County Commissioners approved Work <br />Authorization No. 7, as submitted by Masteller & Moler Associates, <br />Inc., for the subject water distribution system improvements. The <br />original work authorization totalling $195,000.00 included a <br />construction -cost estimate of $180,000.00 and engineering costs of <br />$15,000.00 for the construction of a 12 -inch diameter water main <br />along 12th Street from Old Dixie Highway to 6th Avenue and a 16 -inch <br />diameter water main along Commerce Avenue from 12th Street to 10th <br />Street. <br />Due to re-evaluation of the Water System Master Plan, and to avoid <br />significant construction conflicts along the south side of 12th <br />Street, the 12 -inch water main along the south side of 12th Street <br />has been increased to a 16 -inch main and has been relocated to the <br />north side of 12th Street. Additionally, the 16 -inch water main <br />along Commerce Avenue has been reduced to a 12 -inch water main by <br />means of revised implementation of the Water System Master Plan. <br />ANALYSIS <br />- - - <br />Consistent with the revised <br />construction <br />cost estimate <br />which is <br />attached for your review, following is an <br />outline of the <br />additional__. _ <br />costs of the project: <br />Original <br />Revised <br />Net <br />Design <br />Design <br />Increase <br />Estimated Construction Cost <br />$180,000 <br />$296,000 <br />$116,000 <br />Engineering Fee <br />151000 <br />21,600 <br />6,600 <br />Total Estimated Project Cost <br />$195,000 <br />$317,600 <br />$122,600 <br />44 <br />BOOK 66 <br />rA"J 40UO <br />NOV 18 1986 <br />
The URL can be used to link to this page
Your browser does not support the video tag.