Laserfiche WebLink
HYDROGEOLOGIC ASSESSMENT, NORTH COUNTY WASTEWATER TREATMENT PLANT <br />The Board reviewed memo of Director Pinto and attached <br />letter: <br />TO: <br />FROM: <br />SUBJECT: <br />BACKGROUND <br />BOARD OF COUNTY COMMISSIONERS DATE: NOVEMBER 12, 1986 <br />TERRANCE G. PINT-' <br />DIRECTOR OF UTILI4Y% SERVICES <br />HYDROGEOLOGIC ASSESSMENT - NORTH COUNTY WASTEWATER <br />TREATMENT PLANT <br />The Board of County Commissioners authorized the Utilities Department <br />to proceed with the evaluation of 150 plus or minus acres in the North <br />County for the purpose of locating a wastewater treatment plant. <br />To proceed it is necessary to have. a Hydrogeologic Assessment <br />preformed as described in the attached letter from Seaburn and <br />Robertson, Inc. The cost estimate is $12,500.00. If the study <br />indicates the property will be suitable for our needs and we purchase <br />the property, then the study will be used for permitting requirements <br />- with an additional cost ranging from $4,000.00 to $8,500.00. <br />ANALYSIS - - - <br />Staff finds this estimate to be in line. If the project is to proceed <br />the study must be preformed. <br />RECOMMENDATION <br />Under the continued contract with Masteller and Moler, Inc., staff <br />requests the Board of County -Commissioners authorize Masteller and <br />Moler, Inc., to issue a work authorization and to proceed as set forth <br />in the attached letter dated November 4, 1986, from Seaburn and <br />Robertson, Inc., to Masteller and-Moler,"Inc. <br />OV 18 1986 <br />46 BOOK 66 Fr1'UE 411 <br />L <br />