My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/9/1986
CBCC
>
Meetings
>
1980's
>
1986
>
12/9/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:20 AM
Creation date
6/12/2015 1:19:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/09/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. None of the proposed improvements to the dormitory site are <br />located within 200 feet of the present south property line or <br />north edge of main relief canal R.O.W. line. <br />Site Plan Appeal Alternatives and Analysis: <br />This County, like many other counties, requires dedication of <br />additional right-of-way at the time property is developed, if <br />right-of-way widths abutting or included in the proposed develop- <br />ment do not meet locally adopted standards. The dedication of <br />additional right-of-way in association with new development <br />implements the Board's policy of new development "paying its way". <br />The Thoroughfare Plan specifically identifies primary or secondary <br />collector corridors at half mile increments throughout much of the <br />County: The designation of roadway classification is based on <br />standard traffic engineering practice. Examples of secondary <br />collector corridors include 16th Street, 8th Street, and 1st <br />Street S.W. while examples of primary collectors include 12th <br />Street and 4th Street.. The State mandated comprehensive plan <br />revisions which will be adopted by the County by 1989 will <br />probably include much higher residential densities east of I-95 <br />due to public water and wastewater availability, and the need for <br />a planned and developed roadway network will soon become readily <br />apparent. <br />The rationale for an 80 foot wide R.O.W. is clear. The 80 foot <br />wide R.O.W. required for secondary collectors is based on an <br />ultimate pavement width of 36 feet, six foot wide stabilized <br />shoulders on each side of the pavement, and a 16 foot wide area <br />for drainage swales, sidewalks or bikeways and utilities on each <br />side of the pavement and shoulders (see attachment). <br />Three alternatives are available to the Commission. The first <br />option is to approve the site plan conditioned on the dedication <br />of 80 feet of R.O.W. as required by County Code and as identified <br />on the adopted Thoroughfare Plan map. The second option is to <br />table the applicant's request and initiate a study of present <br />R.O.W. acquisition policy. The present policy of R.O.W. acquisi- <br />tion has been reviewed frequently during the last several years <br />and the present policy is a reflection of past investigations. <br />The County planning staff has recently submitted a grant proposal <br />to the State that would fund a comprehensive and detailed study of <br />the problems associated with acquiring County road R.O.W. along <br />drainage district canal R.O.W. If the County is successful in <br />obtaining the grant, the resulting study may identify other <br />options for implementing the Thoroughfare Plan. The focus of the <br />study will be to identify alternatives for implementation of road <br />right-of-way acquisition where such road right-of-way abuts canal <br />right-of-way. The study will not be concerned with modification <br />of right-of-way width standards amendments to the Thoroughfare <br />Plan. The third alternative concerns dedication of the 80 feet of <br />R.O.W. with a reverter clause that would permit all or part of <br />the right-of-way to revert back to the present owner whenever it <br />was determined that the right-of-way was not necessary for the <br />establishment of permanent public access for properties in the <br />vicinity along the north side of the main relief canal. <br />Usually, developments are required to make up half of any <br />right-of-way deficiency through dedication. Dedication of R.O.W <br />57 <br />DEC 9 1986 BOOK Pi- 634 <br />
The URL can be used to link to this page
Your browser does not support the video tag.