My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/6/1987
CBCC
>
Meetings
>
1980's
>
1987
>
1/6/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:17 AM
Creation date
6/12/2015 1:24:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/06/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r JAN <br />6 1987 <br />BOOK 66 8?1 <br />MOTION WAS MADE by Commissioner Eggert, SECONDED by <br />Commissioner Bird, to create a four-way stop at the <br />intersection of 15th St. SW and 19th Ave. SW. <br />Commissioner Bird commented that he is not really in favor <br />of a proliferation of four-way stops to slow traffic, but since <br />Mr. Myers has demonstrated a very deep concern by coming to the <br />Board on three different occasions, he would vote for the Motion. <br />THE CHAIRMAN CALLED FOR THE QUESTION. It was voted on <br />and carried unanimously (4-0). <br />SHERIFF'S ADMINISTRATION BLDG. 6 911 CENTER - CHANGE ORDER #2 <br />General Services Director Dean reviewed the following memo: <br />TO: The Honorable Members of DATE: December 23, 1986 FILE: <br />the Board of County <br />Commissioners <br />THRU: Charles P. Balczun SUBJECT: Sheriff's Administration <br />County Administrator Building and 911 Center <br />Change Order, IRC3 - 2 <br />H. T. De <br />FROM: Director REFERENCES: <br />General Services <br />BACKGROUND <br />At the time the subject general contract was advertised for bid, we <br />had no idea what would be required or needed to complete the inside <br />of the 911 center. In order to avoid holding up construction of the <br />entire project, the contractors were requested to bid on construction <br />of the Rgtside walls only of the center. <br />A <br />It was agreed that the Architect would come back to the Board with <br />the change orders necessary for equipment and materials as dictated <br />by the approved design of the facility. <br />GENERAL <br />Change Order No. IRC3 - 1, approved by the Board on 12/23/86, <br />provided for conduit to be placed under the concrete floors of the <br />two subject buildings. Change Order IRC3 - 1 was prepared and <br />submitted earlier to avoid a delay to the general contractor in <br />pouring the concrete in the floors. <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.